My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004916
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
18353
>
2600 - Land Use Program
>
PA-0500142
>
SU0004916
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2019 9:43:57 AM
Creation date
9/5/2019 10:44:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004916
PE
2638
FACILITY_NAME
PA-0500142
STREET_NUMBER
18353
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
MOUNTAIN HOUSE
ENTERED_DATE
3/17/2005 12:00:00 AM
SITE_LOCATION
18353 W GRANT LINE RD
RECEIVED_DATE
3/15/2005 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\18353\PA-0500142\SU0004916\COLLEGE PRK SP III.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
865
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mountain House Specific Plan III <br /> ........................................................................................................................................................................... <br /> 7.2.5.3 Implementation Measures — <br /> a. Larger multi-family developments(those in R-MH and R-H areas)with 75 or more units shall include <br /> provisions for a children's play area or pocket park with the development's private open space. <br /> Alternatively, such multi-family developments may build and maintain such an area within an <br /> adjacent open space corridor,provided public access is allowed. Any adult or senior citizen-only <br /> development will be exempt from this requirement. <br /> b. Focal points,subject to MHCSD design approval, shall be provided as diagrammatically designated <br /> in Figure 7-1. <br /> c. Focal points in Figure 7-1 shall be dedicated to MHCSD if within a designated neighborhood entry. <br /> The offer of dedication and maintenance satisfactorily to the MHCSD shall be recorded with the _ <br /> Final Map. Focal points shall be included with the improvement plans for the subdivision and <br /> constructed at the time the street landscaping is constructed. If the MHCSD does not accept the offer <br /> of dedication,they shall be owned and maintained by an HOA. <br /> d. Private open spaces in larger multi-family developments(those in R-MH and R-H areas)with 75 or <br /> more units shall be provided with a children's play area or pocket park. Private open space <br /> improvements shall be constructed prior to initial occupancy. <br /> 7.2.6 Other Open Space <br /> Other open space areas within Specific Plan IH are addressed in the following sections of this Specific _ <br /> Plan III: <br /> Buffers and Edges—Chapter Four: Development and Design <br /> • Storm Drainage Easements—Chapter Fifteen: Storm Drainage and Flood Protection <br /> • Transmission/Pipeline Easements—Chapter Six: Public Health and Safety <br /> Wetlands—Chapter Seven, Section 7.3: Biological Resources Management <br /> • Street Landscaping—Chapters Four: Development and Design and Chapter Nine: Transportation and <br /> Circulation <br /> 7.2.6.1 Implementation Measures <br /> a. All in-tract landscaping and utility R/W areas and all other landscape areas that were not in the <br /> original Master Plan as defined by the MHCSD within Specific Plan IH will require a funding <br /> mechanism. These areas will require establishment of a maintenance entity or financing <br /> mechanism acceptable to the MHCSD to provide funding for maintenance of,and if necessary, <br /> replacement at the end of the useful life of improvements including,but not limited to — <br /> landscaping,pathways, walls, and all improvements serving or for the special benefit of this <br /> subdivision. The financing mechanism shall be completed and adopted by the Board of Directors _ <br /> prior to the filing of the Final Map. <br /> 7-14 Draft 03/14/05 <br /> ........................................................................................................................................................................... <br />
The URL can be used to link to this page
Your browser does not support the video tag.