Laserfiche WebLink
Mountain House Specific Plan III <br /> ........................................................................................................................................................................... <br /> b. All implementing projects shall comply with the applicable provisions of the MHCSD Potable Water <br /> Master Plan and Development Standards(Section 4: Water System Design Standards) <br /> 12.5 BBID Service to Interim Agricultural Operations <br /> 12.5.1 Master Plan Summary <br /> i The Master Plan requires that water service be maintained to lands outside Mountain House that are <br /> within the BBID service area, and that Mountain House provide permanent or interim facilities as needed, <br /> ` as each phase develops,that will assure continued service to BBID customers. Irrigation water service <br /> and drainage shall be maintained to lands under agricultural use. Specific Plan III will identify how water <br /> and drainage services to the land east of the project and Mountain House Parkway within the BBID <br /> service area would be affected.Tbey will identify the infrastructure needed to maintain these services and <br /> when construction of these facilities would need to be completed(schedule may be expressed in terms of <br /> when certain parcels are developed). <br /> 12.5.2 Specific Plan III Description <br /> Several BBID and private-property owned farm irrigation facilities traverse the Specific Plan III area. <br /> BBID is open to reasonable proposals to maintain water to lands remaining in agriculture during all <br /> development phases. Installation of permanent and temporary pipes,pumps,canals, etc, arc options, as <br /> well as agreements with West Side Irrigation District(WSID)if found workable for all parties involved. <br /> If pipes are used to replace either canal,the size of these pipes would be about 36". The 120 canal <br /> terminates within the Parcel P property and provides water to most of that property. A small part of the <br /> southern part of the Parcel P property gets water from the 155 canal in a pipeline that runs from south to <br /> north. The Parcel P property could conceivably be served from the 155 canal if the 120 canal is <br /> eliminated. If the 155 canal is also eliminated,it may be possible to serve this property from the WSID <br /> pipeline if agreement with WSID is reached. Parcel M may likewise be able to be served by WSID by <br /> �- separate agreement.A"Farm Irrigation and Drainage Report"will be required with Tentative Maps to <br /> address how the irrigation needs of lands remaining in agricultural use will be accommodated.The <br /> college has tentatively proposed to serve some of their irrigation needed with water from the 155 canal. <br /> The cost of any temporary facilities needed to serve agriculture would be the responsibility of the <br /> i <br /> developers. <br /> Under the Specific Plan III development scenario, in conjunction with the proposed development of the <br /> Parcel M Business Park(a part of Specific Plan 1), all of the existing agricultural land will be converted to <br /> residential, commercial and industrial land uses.Also, the Delta Community College proposes to use <br /> Draft 03/14/05 12-9 <br /> ........................................................................................................................................................................... <br />