Laserfiche WebLink
Mountain House Specific Plan III <br /> ............................................................................................................................................I.............................. <br /> irrigation water for all of their landscaping needs, so a permanent irrigation pipeline route from the 155 <br /> canal will need to be established. The Community Park in Specific Plan III may also get non-potable <br /> service. — <br /> 12.5.3 Implementation Measures <br /> a. Farmland Irrigation: All implementing projects shall comply with the applicable requirements of the <br /> Mountain House Development Title including the requirement to perform detailed farmland irrigation <br /> conversion and impacts studies(See Requirements for Application,Major Subdivision). <br /> b. Relocation of Agricultural Service Canals: All necessary easements required to relocate existing <br /> agricultural canals shall be secured prior to approval of final maps for the affected area. — <br /> c. Irrigation water service shall be maintained for properties within the Specific Plan III area that will <br /> remain in agricultural production. — <br /> d. Requirements for Agricultural Irrigation. To ensure an uninterrupted source of irrigation water to <br /> undeveloped land,development permits,as applicable, shall include a detailed assessment of how _ <br /> irrigation water and drainage services to land within the project site that has not been or is not <br /> immediately planned for development would be affected.The assessment shall include consideration ^ <br /> of interruption of irrigation patterns, temporary interruptions in service due to installation of <br /> underground utilities,and access to farm fields by workers,equipment and trucks. A plan for <br /> constructing/modifying facilities to maintain irrigation water and drainage services and a schedule for <br /> constructing these facilities shall be included. <br /> e. Farm Drainage Requirements. As part of the environmental assessment, development permits,as <br /> applicable,shall include a report on the existing impacted farm irrigation drainage. Such plans shall <br /> include a map of existing farm drains that flow through or drain the Specific Plan area. Any such <br /> drains are to be identified on the maps as to type,location and function. The report will include an <br /> analysis of the impacts on the drainage system and a determination of the planned dispossession of <br /> the system. If any portion of the system is to be abandoned, the pipes and drains shall be removed <br /> unless reusable. If the drainage system is usable for the control of the water table and/or storm runoff, <br /> it may be integrated into the storm system and be subject to the same conditions required for storm <br /> runoff. In conjunction with the physical removal of irrigation facilities, a formal abandonment of the _ <br /> BBID irrigation easement is also required,along with payment of a vacation fee to BBID. <br /> f. Costs. Any costs associated with reconstruction or rerouting of irrigation waters caused by — <br /> development shall be paid for by the individual development causing the reconstruction or rerouting <br /> subject to reimbursement if the first builder has to front larger area rerouting. _ <br /> 12-10 Draft 03/14105 <br /> ........................................................................................................................................................................... <br />