Laserfiche WebLink
r <br /> Mountain House Specific Plan III <br /> ........................................................................................................................................................................... <br /> appurtenant pumping plant equipment on the adjacent community. The color of the storage tank shall be <br /> such as to minimize the visual impact on the adjacent land uses. Colors selected shall be generally neutral <br /> �- that will allow the facility to blend in with the visual character of the neighborhood. Landscaping, <br /> especially trees, shall be used to visually buffer the storage tank. Additional design considerations <br /> include: <br /> • Design of tanks with the lowest possible profile consistent with sound economical engineering <br /> practices.Tanks shall be depressed below ground level as much as possible. <br /> r <br /> • Tanks shall be constructed to provide for Public Safety in the event of rupture. <br /> • Tanks shall be screened from view to the greatest extent possible using a combination of grading, <br /> ` fencing,landscaping, walls,and tank color. <br /> 12.7.3 Implementation Measures <br /> a. The Zone 2 water tank shall be constructed and deemed operational prior to the issuance of any <br /> 6' occupancy permits for the construction of buildings within Specific Plan III. <br /> b. All implementing projects shall comply with the applicable provisions of the MHCSD Potable Water <br /> Master Plan and Development Standards and Design Manual. <br /> c. Water storage tanks shall be designed to minimize as much as possible the adverse visual and noise <br /> impacts on the adjacent community. The color of the storage tanks shall be such as to minimise the <br /> visual impact on the adjacent land uses. Colors selected shall be generally neutral that will allow the <br /> facility to blend in with the visual character of the neighborhood. Landscaping, especially trees,shall <br /> r <br /> be used to minimize light impacts on adjoining properties. Water storage facilities shall be <br /> constructed with the lowest profile consistent with sound economical engineering practices. Tanks <br /> shall be depressed below ground level as much as possible. <br /> 12.8 Water Distribution System <br /> 12.8.1 Master Plan Summary <br /> The Master Plan limits the area to be served by the water distribution system to the Mountain House <br /> community boundaries shown in the General Plan. The system will provide a reliable water distribution <br /> ` system that will provide optimum quality,a reasonable pressure range during maximum water demand <br /> periods,and adequate capacity to deliver water in cases of emergencies. It will be designed and <br /> y constructed to assure a reliable and cost-effective water supply to the community. <br /> r <br /> Draft 03/14/05 12-13 <br /> ........................................................................................................................................................................... <br />