Laserfiche WebLink
Mountain House Specific Plan III <br /> ........................................................................................................................................................................... <br /> The MHCSD is currently in the process of developing a Sludge Management and Disposal Plan to comply <br /> with applicable requirements,as part of the future expansion plans for the waste water treatment plant. This <br /> plan needs to address the most economical and beneficial manner to dispose of the treated sludge. It will be <br /> developed in accordance with applicable regulations and will be implemented as part of the implementation of <br /> Specific Plan III. <br /> ` 13.6.3 Implementation Measures <br /> a. Until sludge is classified,the sludge shall be disposed of by the MHCSD in the Foothill or other <br /> _ acceptable landfill. Sludge shall meet non-hazardous classification and be dried for disposal in a landfill. <br /> b. The sludge shall be assessed regularly by the MHCSD for waste classification and the alternatives of <br /> land application, dedicated land disposal and composting, shall be analyzed based on such factors as <br /> i <br /> current regulations, sludge constituents,land availability, demand for compost and cost to implement. <br /> c. Sludge disposal alternatives shall be evaluated and selected by the MHCSD at a six month interval. <br /> 13.7 Capital Facility Cost and Phasing <br /> 13.7.1 Master Plan Summary <br /> The Master Plan required that initial aerated lagoons and pumps be sized to satisfy the demands of the first <br /> neighborhood They will be replaced with a higher volume treatment facility upon commencement of the <br /> second Specific Plan,and will be expandable to accommodate future development phases.All line sizing will <br /> be engineered to handle through flows from successive neighborhoods in accordance with the Master Plan. <br /> Cost and phasing assumptions are discussed in more detail in the Public Financing Plan(PFP). <br /> All implementing projects shall comply with the applicable requirements of the Public Financing Plan and <br /> Technical Report,any Master Acquisition and Reimbursement Agreement between the MHCSD and Specific <br /> Plan III developers,any Development Agreement between San Joaquin County and Specific Plan III <br /> i <br /> developers,MHCSD Capital Improvement Program,and applicable development fee ordinances. As may be <br /> required,such additional financing plans,technical reports,agreements and amendments to existing <br /> agreements and ordinances shall be developed to facilitate the permitting and construction of additional waste <br /> water treatment and disposal facilities required to serve the needs of Specific Plan III. <br /> Draft 03114/05 13-9 <br /> ........................................................................................................................................................................... <br />