Laserfiche WebLink
Mountain House Specific Plan III _ <br /> ........................................................................................................................................................................... <br /> 13.7.2 Specific Plan III Description <br /> The developers of Specific Plan III shall arrange financing and coordinate with the MHCSD for the required <br /> special studies,design,approval and construction of waste water collection system and treatment plant capital <br /> improvements. The Specific Plan III developers shall enter into agreements with MHCSD and Trimark <br /> Communities to provide financing and pay their fair share of all required wastewater infrastructure,both — <br /> existing facilities and that proposed for Specific Pian 1Il and other Specific Plan areas developing concurrently. <br /> 13.7.3 Implementation Measures <br /> None. <br /> 13-10 Draft 03114/05 <br /> ........................................................................................................................................................................... <br />