Laserfiche WebLink
rn m <br /> 3 n Table 2-1 (continued) <br /> Summary of Impacts and Mitigation Measures (Applicable to Program and Project-Specific Impacts) <br /> Impact Significance Mitigation Measure Significance <br /> before Mitigation after Mitigation <br /> maintenance of the proposed 82-acre regional park at Old River. <br /> Additionally,the proposed project would provide sufficient parkland <br /> to serve the needs of future residents.A less-than-significant <br /> impact would occur. <br /> 4.4-2.Public Services—Additional Demand for K-8 Schools. LTS No mitigation required. LTS <br /> The oroiect would result in the construction of residential units that <br /> would result in the demand for public elementary school facilities and <br /> services. However,the proposed project would provide sites for two <br /> new K-8 schools and would pay the required state-mandated school <br /> impact fees,which,according to state law,represents full mitigation <br /> of K-8 school capacity impacts. Public safety impacts associated <br /> with pedestrian access could occur,but the SJDCCD has agreed to <br /> fund buses to reduce the need for pedestrian access. A less-than- <br /> significant impact would occur. <br /> 4.4.3.Public Services—Additional Demand for Public High LTS 4.4-3.Public Services Additional Demand for Public High LTS <br /> Schools.The project would result in the construction of residential Schools.Project developers shall enter into project-specific <br /> units that would result in the demand for public high school facilities mitigation with TUSD that determines the development impact fee to <br /> and services. However,a new high school is planned in the be paid for the construction or rental of temporary portable buildings <br /> Specific Plan I area of the MHMP that would provide adequate high to be placed at West High School or Tracy High School. <br /> f school service to the proposed project,and the proposed project <br /> would pay the required state-mandated school impact fees that, <br /> according to state law,represent full mitigation of high school <br /> a capacity impacts. A less-than-significant impact would occur. <br /> 4.4-4. Public Services—Add@ional Demand for College 8 No mitigation required. B <br /> m Services.The project would result in the construction of residential <br /> units that would result in the demand for college facilities and <br /> g services.A beneficial impact would occur. <br /> N <br /> cn 4.4-5.Public Services—Additional Demand for Fire-Protection LTS No mitigation required. LTS <br /> Services.The project would result in the construction of residential <br /> units that would result in the demand for fire-protection and <br /> emergency-medical services. However,a fire station is under <br /> construction close to the project site which would serve the College <br /> Park project under the MHMP. A less-than-significant impact would <br /> g occur. <br /> � m <br /> I <br />