Laserfiche WebLink
1 l t 1 ( ( 9 1 ( I 1 I I 1 ( I f <br /> Table 2-1 (continued) <br /> o Summary of Impacts and Mitigation Measures (Applicable to Program and Project-Specific Impacts) <br /> m <br /> x Impact Significance Mitigation Measure Significance <br /> u before Mitigation after Mitigation <br /> ,2 implemented. <br /> F2. . The ASTs,USTs,and dairy waste ponds at the project site <br /> o shall be removed under the supervision of qualified hazardous <br /> y materials experts in accordance with applicable regulations and <br /> W removal permit requirements from the County Environmental <br /> Health Department.The soil underlying these facilities shall be <br /> sampled and tested by the experts.If the testing reveals <br /> contamination,the regulatory agencies shall be contacted,any <br /> recommendations made by the experts shall be implemented, <br /> o and the County Environmental Health Department shall identify <br /> "no further actions required"before project construction access <br /> Ln at these locations. <br /> Other potential existing sources of contamination(i.e.,septic <br /> systems,refuse piles,waste ponds,electrical transformers <br /> containing PCBs)on the project site and off-site infrastructure <br /> sites shall be identified and removed under the supervision of <br /> qualified hazardous materials experts and in accordance with <br /> applicable regulations before construction.The applicant shall <br /> demonstrate to the County Environmental Health Department <br /> that the above has taken place before issuance of building <br /> permits.If the experts observe potential soil contamination or <br /> noxious odors associated with these facilities,the soils <br /> underlying these facilities shall be sampled and tested by the <br /> experts.If the testing reveals contamination,the regulatory <br /> agencies shall be contacted,any recommendations made by <br /> the experts shall be implemented,and the County <br /> Environmental Health Department shall identify"no further <br /> actions required"before project construction access at these <br /> locations. <br /> ► Phase I ESAs shall be prepared by qualified hazardous <br /> materials experts for areas in Grant Line Village that are the <br /> subject of future development proposals before construction in <br /> these areas.The ESAs shall be reviewed and approved by the <br /> County Environmental Health D@pLrJWe .Any <br /> W rMmmendations main s monitoring, Phase II <br /> Z3 m testing,mitigation,etc.)shall be implemented. <br /> 0 <br /> z > <br />