Laserfiche WebLink
mm <br /> C <br /> :3a <br /> Table 2-1 (continued) <br /> Summary of Impacts and Mitigation Measures (Applicable-to Program arfd Project-9pecffic Impacts) <br /> Impact Significance Mitigation Measure Significance <br /> before Mitigation after Mitigation <br /> Project grading,excavation,and other earth-moving activities <br /> directly adjacent to the off-site parcel where the December 4, <br /> 2003 crude oil release took place shall not occur until it has <br /> been verified,either by the assessment currently being <br /> conducted by the RWQCB or separate soil and groundwater <br /> samp{ing con miiissi0l leu by the Cuiiege Park developers,That <br /> the contamination associated with the incident has not migrated <br /> to the College Park site.If the contamination has migrated to <br /> the College Park site,it shall be fully remediated to the <br /> satisfaction of the County Environmental Health Department <br /> before project construction activities in the contaminated area. <br /> Project construction activities at hazardous materials sites#3 <br /> and 7(identified in Figure 4.9-2 and Table 4.9-1)shall occur <br /> only after any contamination that may exist at these sites has <br /> N been fully remediated to the satisfaction of the County <br /> Environmental Health Department,the status of the sites has <br /> been changed to"no further action required"in the regulatory <br /> agency databases,and the facilities that are the source of any <br /> b' contamination have been removed in accordance with <br /> applicable regulations.The project developers may attempt to <br /> advance the above, if they desire, by conducting their own <br /> investigations of these sites in coordination with the property <br /> owners and regulatory agencies,and working with the <br /> o regulatory agencies to accomplish the above. <br /> Before demolition,renovation,or modification of structures on <br /> the project site and off-site infrastructure sites constructed <br /> before 1981 (parcels containing such structures are listed in <br /> Table 4.9-2),the project developers shall contract with qualified <br /> Cn <br /> hazardous materials experts to survey these buildings for <br /> asbestos and lead-based paint. Demolition, renovation,or <br /> vmodification of any structures identified as containing asbestos <br /> U or lead-based paint shall be performed by a licensed asbestos <br /> and lead-based paint abatement contractor in accordance with <br /> applicable regulations. <br /> m <br />