Laserfiche WebLink
w m <br /> 3 > <br /> 3 Table 2-1 (continued) <br /> Summary of Impacts and Mitigation Measures (Applicable to Program and Project-Specific Impacts) <br /> Impact Significance Mitigation Measure Significance <br /> before Mitigation after Mitigation <br /> 4.9-5.Public Health and Safety—Exposure to Pipeline Hazards. S 4.9-5.Public Health and Safety—Exposure to Pipeline Hazards. LTS <br /> The proposed project would result in the development of sensitive The following measures shall be implemented by the College Park <br /> land uses in close proximity to existing natural gas and crude oil developers: <br /> pipelines,and would expose persons to contamination or explosion . No habitable residential structures(i.e.,homes,apartments, <br /> hazards associated with the pipelines.A significant impact would granny flats,garages converted to living quarters,patio rooms, <br /> occur.o sun rooms)shall be permitted within 68 feet of the PG&E– <br /> Chevron pipeline that bisects the College Park site and <br /> contains Pipelines L401,L002,and CSDF 0499.Alternatively, <br /> no habitable residential structures as defined above shall be <br /> permitted within 68 feet of the nearest pipeline in the PG&E <br /> easement.Outdoor structures such as pools,fences,patios, <br /> and decks could be allowed within the no build zone,since <br /> occupancy would be less than 100%.Garages would be <br /> permitted as long as documentation accompanies the sale or <br /> rental documents for the residence prohibiting conversion of the <br /> No garage to a habitable use(spare bedroom,game room,etc.). <br /> Public disclosure of the hazard posed by the Pipelines L401, <br /> L002,and CSDF 0499 shall be provided in the purchase and <br /> o rental agreements for all habitable residential structures to be <br /> located within 249 feet of the PG&E/Chevron easement,and <br /> shall appear in all subsequent purchase and rental agreements <br /> associated with these structures. <br /> 4.M.Public Health and Safety—Exposure to Electromagnetic LTS No mitigation required. LTS <br /> oFields.The proposed project would comply with CDE school <br /> m setback requirements from electrical transmission lines.While the <br /> project would result in development of residential uses in close <br /> 0 proximity to electrical transmission lines,project compliance with <br /> the requirements of the MHMP and MHMP MMP would avoid <br /> $ significant adverse EMF-related health effects.A less-than- <br /> En significant impact would occur. <br /> m n <br /> ` 4.9.7.Public Health and Safety—Exposure to Non-Potable LTS No mitigation required. LTS <br /> a Water. The proposed project would supply reclaimed water to the <br /> community college for landscape uses. A less-than-significant <br /> impact would occur. <br /> rn <br /> = m <br /> ,7 � <br />