Laserfiche WebLink
t 1 1 ( ! f 1 1 t t Y 1 Y l <br /> W o Table 2-1 (continued) <br /> o Summary of Impacts and Mitigation Measures (Applicable to Program and Project-Specific Impacts) <br /> m <br /> m Significance Significance <br /> Impact before Mitigation Mitigation Measure after Mitigation <br /> 4.9.2.Public Health and Safety—Possible Exposure to LTS No mitigation required. LTS <br /> w. Hazardous Materials Associated with Upset and Accident <br /> = Conditions During Construction and Operation.The proposed <br /> N project would not use large quantities of hazardous materials that <br /> y would be subject to potential upset and accident conditions,and <br /> although project construction activities would occur in the vicinity of <br /> existing natural gas and crude oil pipelines,project compliance with <br /> v the requirements and mitigation measures of the MHMP and <br /> MHMP MMP would avoid potentially significant upset and accident <br /> conditions involving these pipelines.A less-than-significant impact <br /> m <br /> would occur. <br /> x <br /> ^—' 4.9.3.Public Health and Safety—Emit Hazardous Emissions or LTS No mitigation required. LTS <br /> Handle Hazardous Materials within one-quarter Mile of a <br /> School.The proposed project would be located in on-quarter mile <br /> of planned/proposed schools,but would not generate hazardous <br /> N emissions or handle large quantities of hazardous materials.A less- <br /> than-significant impact would occur. <br /> 4.9.4.Public Health and Safety—Locate a School Site in an S 4.9.4.Public Health and Safety—Locate a School Site in an Area LTS <br /> Area of Potential Hazards.One of the two proposed K-8 school of Potential Hazards. 1 <br /> sites would be located in an area of potential hazardous conditions The College Park developers shall have a PEA prepared by a <br /> as defined by CEQA(Section 21151).The school would be located qualified hazardous materials consultant for the school located near - <br /> less than one-quarter mile from a potential source of hazardous the Lucky J Dairy,if required by CDE.The PEA shall be prepared in <br /> emissions and a location where large amounts of hazardous accordance with CDE and DTSC requirements and shall be <br /> materials may potentially be used and stored.A significant impact reviewed and approved by CDE,DTSC,the San Joaquin County <br /> would occur. Community Development Department(SJCCDD),and the <br /> Lammersville School District. It these agencies determine,based on <br /> the PEA,that the school site does not meet CDE siting <br /> requirements,the proposed school shall be developed at a different <br /> location within the College Park site,subject to clearance by a new <br /> PEA to be funded by the developers.It the new school site is <br /> required,the developers shall be responsible for processing the <br /> required amendment to the College Park Specific Plan III and <br /> obtaining and dedicating the new school site to the school district. <br /> The assessment and analysis would be conducted in accordance <br /> Cn <br /> with CDE requirements and would be under separate CEQA <br /> 3 o documentation, <br /> 4 <br />