My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004916
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
18353
>
2600 - Land Use Program
>
PA-0500142
>
SU0004916
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2019 9:43:57 AM
Creation date
9/5/2019 10:44:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004916
PE
2638
FACILITY_NAME
PA-0500142
STREET_NUMBER
18353
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
MOUNTAIN HOUSE
ENTERED_DATE
3/17/2005 12:00:00 AM
SITE_LOCATION
18353 W GRANT LINE RD
RECEIVED_DATE
3/15/2005 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\18353\PA-0500142\SU0004916\COLLEGE PRK SP III.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
865
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U3 o Table 2-1 (continued) <br /> o Summary of Impacts and Mitigation Measures (Applicable to Program and Project-Specific Impacts) <br /> m <br /> °� Significance Significance <br /> 8 » Impact before Mitigation Mitigation Measure after Mitigation <br /> c 3 <br /> a 4.12.3.Air Quality—Possible Temporary and Occasional S 4.12.3:Air Quality—Possible Temporary and Occasional LTS <br /> 5. Exposure of New Sensitive Uses to Odors.The proposed project Exposure of New Sensitive Uses to Odors.The College Park <br /> = would not include the types of land uses that would generate developers shall not develop any new residential uses within 1,000 <br /> H objectionable odors that could adversely affect either existing or feet of the two existing on-site dairies until such time as the diaries <br /> proposed sensitive land uses. However,the proposed project could cease operation and the dairy waste ponds and animal refuse piles <br /> Cn <br /> result in the development of new sensitive land uses(residential) are removed. <br /> adjacent to two existing on-site dairies. This could expose the new <br /> v sensitive uses to objectionable odors from these dairies on a <br /> temporary basis until these dairies are replaced with urban <br /> development under the proposed project. A significant impact <br /> w <br /> could occur. <br /> n—' 4.124.Air Quality—Generation of Local Mobile-Source CO LTS No mitigation required. LTS <br /> 'c Concentrations.Implementation of the proposed project would <br /> result in the generation of CO at nearby intersections from <br /> increased vehicular traffic on the local transportation network. <br /> w However,the proposed project would not contribute to CO <br /> concentrations that exceed the CAAQSs of 9.0 ppm for 8 hours or <br /> 20 ppm for 1 hour at these intersections during or at buildout <br /> (2025). A less-than-significant impact would occur. <br /> 4.12-5.Air Quality—Increased Long-Term Regional Emissions SU 4.12.5: Air Quality—Increased Long-Term Regional Emissions SU <br /> of Criteria Pollutants.Implementation of the College Park project of Criteria Pollutants.The College Park developers shall <br /> would result in increases in long-term regional emissions,primarily implement all of the mitigation measures as recommended in the <br /> associated with mobile sources that would exceed SJVAPCD's Guide for Assessing and Mitigating Air Quality Impacts(SJVAPCD <br /> recommended significant thresholds of 10 TPY for ROG and 10 1998). Many of these measures are already included in the <br /> TPY for NOx. A significant and unavoidable impact would occur. proposed project design and/or are already required by the MHMP <br /> and by mitigation in the MHMP and Delta College EIRs, <br /> 4.13.Noise <br /> 4.13.1.Noise—Generation of Temporary Construction Noise, S Mitigation Measure 4.13.1: Noise—Generation of Temporary LTS <br /> The proposed project could result in construction-related noise Construction Noise. <br /> between 9:00 p.m.and 6:00 a.m.that would exceed applicable ► Limit project construction activities to the hours between 6:00 <br /> County noise standards at nearby existing and proposed residential a.m.and 9:00 p.m. <br /> land uses.A significant impact could occur. ► Comply with the San Joaquin County Development Title for all <br /> construction activities. <br /> M ► Equip all construction vehicles or equipment,fixed or mobile,with <br /> n properly operating and maintained mufflers and acoustical <br /> z � <br />
The URL can be used to link to this page
Your browser does not support the video tag.