Laserfiche WebLink
rn m <br /> 3 n Table 2-1 (continued) <br /> m Summary of Impacts and Mitigation Measures (Applicable to Program and Project-Specific Impacts) <br /> Impact Significance Mitigation Measure Significance <br /> before Mitigation after Mitigation <br /> shields or shrouds,in accordance with manufacturers' <br /> recommendations. <br /> ► Arrange all construction equipment and truck routes to minimize <br /> travel adjacent to occupied residences. <br /> ► Locate stationary construction equipment and staging areas as <br /> far as possible from sensitive receptors.Temporary acoustic <br /> barriers may be installed around stafiunnry equipment,if <br /> necessary. <br /> 4.13.2.Noise—Generation of New Stationary-Source Noise. S Mitigation Measure 4.13-2:Noise—Generation of New LTS <br /> The proposed project would result in new stationary-source noise Stationary-Source Noise.The project applicants shall incorporate <br /> (specifically,noise from commercial/office/industrial uses and the measures identified below into the project design. <br /> landscape maintenance)that could exceed applicable County noise <br /> standards at existing and proposed nearby noise-sensitive land Commercial,Office,and Industrial Uses <br /> uses.A significant impact could occur. Industrial and commercial land uses proposed as part of the College <br /> N Park project shall be designed to ensure that outdoor equipment <br /> does not result in an exceedance of 55 dBA Leq during daytime <br /> hours(7:00 a.m.to 10:00 p.m.)or 50 dBA Lea during nighttime hours <br /> (10:00 p.m.to 7:00 a.m.)at off-site noise-sensitive receptors. In <br /> addition,design and operational standards shall be established to <br /> minimize noise generated by loading dock activities from adversely <br /> affecting planned and existing off-site noise-sensitive land uses. <br /> Design and operational measures may include: <br /> ► Enclose outdoor noise-generating equipment and/or set back <br /> from the property line. <br /> o . Locate buildings and structures such that they shield off-site <br /> sensitive receptors from on-site noise sources,including <br /> loading dock activity. <br /> 0 . Enclose loading dock areas. <br /> Limit loading dock activity,including delivery truck arrivals and <br /> departures,to between 7:00 a.m.and 10:00 p.m.at those <br /> loading docks with direct line of site of noise-sensitive receptors <br /> C, <br /> � 0 within a distance of 1,000 feet.Activity at all other loading <br /> d docks shall be limited to the hours between 5:00 a.m.and <br /> a - 10:00 P.M. <br /> o Noise studies,including on-site sound level measurements,shall be <br /> o conducted to ensure that these thresholds are not exceeded.The <br /> C m <br /> C - <br />