Laserfiche WebLink
3.8 DEVELOPMENT PROGRAM <br /> Table 3-1 below provides a summary comparison of proposed development at the 815.6-acre College Park site <br /> and planned development under the MHMP at buildout(2025).As indicated in the table,buildout of the proposed <br /> project would include 2,302 residential units, 1,763,390 square feet of commercial/office/industrial uses,42.3 <br /> acres of parks,two schools,a 108.8-acre community college, 74.6 acres of arterial roads, and 33.3 acres of open <br /> space.' By comparison,as indicated in Table 3-1,buildout of the project site under the MHMP would include <br /> 2,678 residential units, 2,529,797 square feet of commercial/office/industrial uses,48.0 acres of parks, 76.0 acres <br /> of arterial roads, and 3.0 acres of open space. <br /> Table 3-1 <br /> Summary Comparison—Buildout(2025) Under Proposed Project vs. MHMP <br /> Land Use Proposed College Park Project MHMP Difference <br /> Residential 2,302 units° 2,678 units° -376 units <br /> Conamercial/Office/Industrial 1,763,390 sf 2,529,797 sf -766,407 sf <br /> parks b 42.3 acres 48.0 acres -5.7 acres <br /> K-8 Schools 2 schools 2 schools No change <br /> - Community College 108.8 acres —` +108.8 acres <br /> _ Arterial Roads 83.1 acres 77.5 acres +5.6 acres <br /> Open Space 33.3 acres 3.0 acres +30.3 acres <br /> Note: Based on September 24,2004 concept plan. <br /> .� a Does not include approximately 133 second units permitted by right of zone or density bonus units. <br /> b Does not include approximately 7.0 acres of joint-use athletic facilities with the community college. <br /> c College not included in MHMP. <br /> Source:data compiled by EDAW in 2004 <br /> The major differences between site development under the College Park project and the existing MHMP are <br /> threefold. First,the proposed project would result in the development of less residential and <br /> commercial/office/industrial uses than would buildout under the MHMP. Second,the proposed project would <br /> result in the development of a community college that would not be constructed under the MHMP.Third,there is <br /> " an increase in open space from 3.0 acres to over 33 acres.The decrease in residential and commercial/industrial <br /> uses in the proposed project is a result of accommodating the community college within existing infrastructure <br /> and jobs/housing balance constraints. <br /> The amount of development that would occur at buildout of the College Park project is identified in Table 3-2. <br /> The amount of development that would occur at the College Park site under the existing MHMP is identified in <br /> Table 3-3. <br /> I'Be 42.3 acres of parks does not include 7.0 acres of athletic facilities to be to be developed by SJDCCD on the college <br /> parcel that is to be shared with the balance of College Park through a joint-use agreement. <br /> •+ All in-tract landscaping and utility rights-of-way areas and all other landscape areas that were not in the original MEW,as <br /> defined by the MHCSD within Specific Plan III,will require a funding mechanism.These areas will require establishment of <br /> a maintenance entity or financing mechanism acceptable to the MHCSD to provide funding for maintenance of,and if <br /> necessary,replacement at the end of the useful life of improvements.Improvements include,but are not limited to: <br /> .. landscaping,pathways,walls,and all improvements serving for the special benefit of this subdivision.The financing <br /> mechanism shall be completed and adopted by the MHCSD Board of Directors before the filing of the Final Map. <br /> College Park at Mountain House Specific Plan III Draft EIR EDAW <br /> San Joaquin County 3-17 Project Description <br />