My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004916
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
18353
>
2600 - Land Use Program
>
PA-0500142
>
SU0004916
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2019 9:43:57 AM
Creation date
9/5/2019 10:44:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004916
PE
2638
FACILITY_NAME
PA-0500142
STREET_NUMBER
18353
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
MOUNTAIN HOUSE
ENTERED_DATE
3/17/2005 12:00:00 AM
SITE_LOCATION
18353 W GRANT LINE RD
RECEIVED_DATE
3/15/2005 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\18353\PA-0500142\SU0004916\COLLEGE PRK SP III.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
865
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Unlike other parts of the MAW,two neighborhoods were combined into one for the College Park Specific Plan <br /> Ill.Neighborhoods A and B were combined into Neighborhoods A/B so that the community college could be _ <br /> accommodated in what was originally a large portion of Neighborhood A(in the MHMP)and also to allow the <br /> development of two K-8 schools on one side of Central Parkway. Consequently, the MHMP policies related to <br /> providing a central school,neighborhood park, and neighborhood commercial center at the center of each _ <br /> neighborhood were not able to be complied with,and corresponding amendments to the MHMP are proposed as <br /> part of the College Park Specific Plan III project to achieve consistency between the documents.The two schools <br /> were both proposed at the eastern side of Neighborhoods AB so that few students required bussing or crossing of <br /> the Central Parkway arterial. <br /> A neighborhood park is proposed at the western edge of Neighborhoods A/B but no commercial center is <br /> proposed adjacent to this park. Consequently,residents of Grant Line Village and the western portion of — <br /> Neighborhoods AB would have to travel more than 3,600 feet(0.68 miles)to reach a commercial center. The <br /> nearest commercial center would be located in Specific Plan II at the northeast comer of Grant Line Road and <br /> Central Parkway and would require crossing an arterial.Residents would also have to cross Central Parkway to — <br /> reach the Neighborhood Commercial center located near the schools at the eastern side of Neighborhoods AB. <br /> The limited number of residential units west of Central Parkway may be too few to support a neighborhood _ <br /> commercial center unless such a center were placed in the southwest portion of the project site. In this way, the <br /> SJDCCD and the proposed business park occupants could support associated commercial uses,and could walk or <br /> bicycle to such uses without requiring reliance on an automobile.Associated air quality and noise impacts would <br /> be reduced by the reduced dependency on the automobile. <br /> The existing Grant Line Village is immediately adjacent to the western boundary of the MHMP. There are no <br /> buffer zones in this area.Unlike the area to the north,where Great Valley Parkway and residential setbacks would <br /> create a buffer zone from nearby agricultural operations,no such roadway exists south of Grant Line Road.When <br /> redevelopment of the Grant Line Village area is proposed,buffer zones would be appropriate to identify <br /> consistent with Figure 4-13 of the College Park Specific Plan III. <br /> During development of the College Park site, existing agricultural operations would continue to operate that are in <br /> immediate proximity to new urban development until urbanization occurs. Land use conflicts could arise because _ <br /> of dust,noise, and traffic.Within the College Park site,temporary buffers of at least 100 feet should be <br /> maintained between urban uses and agricultural operations.These buffers could be phased out as agricultural <br /> operations are replaced with urban development. There may not be ongoing agricultural operations at the time that _ <br /> SJDCCD starts construction on the community college as adjacent agricultural properties controlled by GNK, <br /> LLC and California homes would likely be under construction at the same time.However,the precise timing of <br /> these developments is not currently known. Consistency with Policy 3.2.4.2.e of the College Park Specific Plan <br /> III would ensure the provision of temporary agricultural buffers. <br /> Before submittal and approval of tentative maps,the Development Title requires that Farm Irrigation and <br /> Drainage Reports be prepared to identify how agricultural water users would be protected from changes to — <br /> drainage systems within the Mountain House community.As of February 2005,no such reports have been <br /> prepared. Impacts to off-site agricultural operations served by Byron—Bethany Irrigation District(BBID) canals <br /> that pass through the College Park site are not anticipated with compliance with this regulation and the fact that <br /> the Farm Irrigation and Drainage Reports would clearly identify means to ensure continued agricultural water <br /> availability to off-site users. <br /> Because of the changes in land use locations proposed as compared to the MHMP,the project would result in a <br /> different traffic distribution pattern. On some roadways(e.g.,Grant Line Road),the traffic volumes would be <br /> increased,resulting in increased traffic-related noise.This land use conflict impact is considered potentially _ <br /> significant. See also Section 4.13,"Noise,"for a discussion of significant traffic-related noise impacts associated <br /> with implementation of the proposed project. <br /> EDAW College Park at Mountain House Specific Plan III Draft EIR <br /> General Plan Policies and Zoning 4.3-4 San Joaquin County <br />
The URL can be used to link to this page
Your browser does not support the video tag.