Laserfiche WebLink
parks should respond to the needs of neighborhood residents as surveyed by the MHCSD per their Parks, <br /> Recreation and Leisure Plan. the MHCSD shall begin as <br /> Implementation Standard 7.2.2.3(b). Cotrrmction of neighborhood parks by _ <br /> emits for each neighborhood or school attendance area hs for the ve gone <br /> final inspection. The park shall be completed no later than after 80%of dwelling-unit Permit <br /> neighborhood have undergone final inspection. <br /> Implementation Measure 7.2.3.3(a). Facilities and Design Criteria for community parks shall be consistent <br /> with the Parks,Recreation and Leisure Plan and the MHCSD Design Manual. <br /> truction of the community park shall begin recti <br /> later than the time <br /> Implementation Measure 7.2.3.3(b). Conshave had their final insp on.The park shall <br /> at which 50%of the dwelling unit permits for Specific Plan III h <br /> be completed no later than the time 80%of the dwelling odmitss f r Specific <br /> er1�CSD Mho been <br /> to reflect <br /> inspection completion time.Completion time may <br /> construction and weather contingencies. <br /> Implementation Measure 7.233(e). A formal agreement for joint use of parks and recreation facilities <br /> between the MHCSD and the Delta Community College District shall be required prior to approval of final <br /> maps adjacent to the community park. If an agreement between the MHCSD and the College District is not <br /> finalized by that time,then 7.0 acres will be added to the community park to result in a park size equal to 38 <br /> acres. <br /> Implementation Measure 7.2.3.3(f). The Community Park shall be developed generally consistent with the <br /> Community Park Preliminary Plan(Fig. 7-4: Specific Plan III Community Park Preliminary ). <br /> applicant shall bond for or commence construction of the Community Park prior to occupancy of the 1,650th <br /> residential unit within Specific Plan III with the intent to complete the community park prior to occupancy of <br /> the 1,850th residential unit with SPM. <br /> Implementation Measure 7.2.33(g). Community Park land identified within Specific Plan III shall be <br /> included within the first Tentative Map of each applicant owning or controlling land within the park site. <br /> Community Park land shall be dedicated to the MHCSD or an offer of dedication to the MHCSD shall be <br /> recorded with the Final Map. <br /> Implementation Measure 7.2A.3(c). The design of all implementing public improvements including paths, <br /> alignment,standards,signage, location of[railheads or staging areas, shall comply with the applicable <br /> provisions of the MHCSD Design Manual. <br /> Implementation Measure 7.2.43(d). Timing of Construction—Construction of Open Space Improvements <br /> may be completed on a phased basis to correspond with the development of neighborhoods,or parcels as <br /> determined by the MHCSD, directly adjacent to the facility. Open Space improvements to a specific segment <br /> shall be completed no later than the time at which 80%of dwelling units for the neighborhood,or adjacent <br /> parcels,have been issued final inspection.(The MHCSD General Manager may require completion of the <br /> improvements to an earlier date if it is deemed necessary). <br /> Implementation Measure 7.7.7.3(3). The neighborhood parks shown on the Tentative Map shall be <br /> dedicated to the MHCSD,or an offer of dedication to the MHCSD shall be recorded with the Final Map. <br /> Final Supplemental EIR for Delta College Center at Mountain House 2002(Mitigation Measures) <br /> The Final Supplemental EIR for Delta College Center at Mountain House does not contain mitigation measures <br /> related to parks and recreation that are applicable to the proposed project. <br /> EDAW College Park at Mountain House Specific Plan III Draft EIR <br /> San Joaquin County 4.4-6 Public Services <br />