Laserfiche WebLink
Mitigation Measure M4.4.1-1 <br /> (a) A new Implementation should be added under Objective 1 in Potable Water Supply and Distribution <br /> (Appendix C), as follows: <br /> "b) Specific Plan II and each subsequent specific plan shall reevaluate the adequacy of the <br /> confirmed water supply for the remainder of the project in light of any potential or adopted <br /> restrictions on water diversion by BBID or DWR. The specific plans shall not be approved <br /> unless it can be demonstrated that the confirmed water supply is sufficient to serve the project — <br /> through buildout. If potential or proposed restrictions on diversion would cause the <br /> confirmed water supply to be insufficient to serve the project as proposed in the Draft Master <br /> Plan,then the specific plans shall identify additional water conservation/reuse measures to be _ <br /> incorporated into the project to ensure that the demand would not exceed the confirmed <br /> supply." <br /> (b) A new Policy should be added under Objective 8 in Potable Water Supply and Distribution(Appendix C), <br /> as follows: <br /> "b) Adequate raw water storage will be provided to ensure a continued supply to the project in <br /> case of restriction to water diversion and emergencies that would prevent diversion." <br /> (c) A new Implementation should be added under Objective 8 in Potable Water Supply and Distribution <br /> (Appendix C),as follows: <br /> "c) Assumptions and calculations for determining adequate raw water storage volume, and plans _ <br /> for providing the storage shall be submitted to the County for review and approval prior to <br /> the submittal of the first Development Permit." <br /> Mitigation Measure M4.4.1-2 <br /> (a) The second paragraph of Implementation(a)under Objective 1 in Potable Water Supply and Distribution <br /> should be revised as follows: <br /> "Prior to the submission of a Development Permit including land that may require use of <br /> water associated with its riparian water rights, an agreement between BBID and the CSD — <br /> shall be executed, or ehe Development Permit shall demonstrate that an existing agreement is <br /> still in force. This agreement shall indicate that the parties have agreed to the terms under <br /> which BBID will wheel riparian water through their pumping and conveyance facilities to the — <br /> Mountain House community as provided for in the BBID Water Services Agreement." <br /> (b) Policy a)under Objectives 4 and 5 in Potable Water Supply and Distribution(Appendix C) should be _ <br /> revised,as follows: <br /> "a) Continued irrigation water and drainage service shall be provided to the land within the BBID <br /> service area located east of the project site and Patterson Pass Road throughout project <br /> buildout." <br /> (c) Implementation Measure(a)under Objectives 4 and 5 in Potable Water Supply and Distribution <br /> (Appendix C)should be revised,as follows: <br /> "a) The appropriate specific plans shall identify how water and drainage services to the land east <br /> of the project and Patterson Pass Road within the BBID service area would be affected. They <br /> shall identify the infrastructure needed to maintain these services and when construction of <br /> EDAW College Park at Mountain House Specific Plan III Draft EIR <br /> Public Utilities 4.5-10 San Joaquin County <br />