Laserfiche WebLink
Final Supplemental EIR for Delta College Center at Mountain House 2002 (Mitigation Measures) <br /> The following water mitigation measures from the Final Supplemental EIR for Delta College Center at Mountain <br /> House are applicable to the proposed project. <br /> Mitigation Measure 4.4-1 <br /> ► Project irrigation demand shall be supplied by BBID irrigation water. As part of the project site <br /> annexation,the district shall work with the BBID to develop a detailed irrigation assessment to convey <br /> irrigation water to the project site for landscaping purposes. The District shall obtain a"will serve"letter <br /> from the BBID to confirm the irrigation water supply will be adequate for project irrigation needs. With <br /> this mitigation,the project would consume about 25 percent,or 51.624 gpd, less domestic water than — <br /> would the residential development. <br /> • Proposed water conservation measures shall be submitted in writing by the District to the Mountain _ <br /> House CSD for review and approval prior to the onset of construction of Phase I. The Mountain House <br /> CSD shall confirm that water supply would be adequate for the project and that the project's demand <br /> would not impact other developments within Mountain House. <br /> • The District shall contribute to the cost of updating the Water System Master Plan to account for the <br /> change in land use a the project site and the use of BBID irrigation water for irrigation of project site <br /> landscaping.The updated Water System Master Plan shall be completed and adopted by the Mountain <br /> House CSD Board of Directors prior to construction of Phase I of the proposed project. <br /> ► Mitigation Measure 4.4-2. The District shall pay its fair share costs to construct Phase 11 of the water — <br /> treatment plant. A"will serve"letter shall be issued by the Mountain House CSD prior to construction of <br /> Phase I of the proposed project. <br /> Mitigation Measure 4.4-3.the District shall contribute to the cost of updating the Water System Master Plan. — <br /> This plan shall identify the location of water storage tanks and their sizing. The updated Water System <br /> Master Plan shall be completed and adopted by the Mountain House CSD Board of Directors prior to <br /> construction of Phase I of the proposed project. Once the location and sizing of the water storage tank has <br /> been determined,the District shall pay its fair share costs to construct the facility. <br /> Mountain House Community Services District Design Manual 2002 <br /> There are no water design measures or standards identified in the Mountain House Community Services Design <br /> Manual applicable to the proposed project. <br /> Significant Impacts Identified in the 1994 Mountain House Master Plan and Specific Plan I Final <br /> EIR _ <br /> The MHMP EIR identified the following significant public utilities impacts associated with implementation of the <br /> MHMP: <br /> ► Inadequate raw water storage in case of restrictions of water diversions imposed by state or federal agencies. <br /> ► Adverse impacts on continuing agricultural operations in the area,resulting from conversion from agricultural <br /> to municipal/industrial water use. <br /> Inadequate water supply for Master Plan buildout. <br /> ► Lack of sufficient water-treatment capacity for initial or subsequent development within the Master Plan area. <br /> EDAW College Park at Mountain House Specific Plan III Draft EIR <br /> Public Utilities 4.5-16 San Joaquin County <br />