Laserfiche WebLink
the approval of the first final subdivision map. A separate Development Permit shall be <br /> ` required for each change in disposal method or area,or with each specific plan after Specific <br /> Plan I, whichever is sooner. Each Development Permit for the wastewater treatment plant <br /> shall describe the mechanism by which the construction of additional facilities for <br /> incremental expansion in treatment capacity shall be completed before the existing capacity is <br /> exceeded" <br /> (g) The following new Implementation should be added under Objectives 1 and 2 in Wastewater Treatment <br /> Plant(Appendix C): <br /> "g) Specific plans subsequent to Specific Plan I shall include a comparison of the actual <br /> wastewater generation rates for the project with that calculated in the Draft Master Plan. If <br /> wastewater flow rates were higher than those predicted in the Draft Master Plan assuming <br /> implementation of water conservation measures,then the next specific plan shall specify <br /> actions that would be implemented in the next specific plan to reduce the wastewater <br /> generation rates. Approval of the specific plan(s)shall be contingent on the adequacy of the <br /> proposed actions to reduce wastewater generation rates to those calculated in the Draft Master <br /> ` Plan,if appropriate." <br /> (h) Objective 1 in Wastewater Reuse Program(Appendix C) should be revised,as follows: <br /> "All wastewater from the project shall be reclaimed to the maximum extent possible by <br /> assuring that the best beneficial use of the wastewater is implemented throughout the life of <br /> the project." <br /> (i) Policy c)under Objective 1 in Wastewater Reuse Program(Appendix C)should be revised, as follows: <br /> "c) Water reclamation facilities shall be designed and operated to minimize physical adverse <br /> effects on crop production,public health,groundwater,or surface waterways from <br /> agricultural irrigation with reclaimed water. Physical adverse impacts include salt and trace <br /> metal buildup in soil that prevents the growth of crops,or impacts to surrounding surface <br /> waterways due to discharge from agricultural drainage systems underlying the reclamation <br /> site.,, <br /> (j) Implementation(a)under Objective 1 in Wastewater Reuse Program(Appendix C)should be replaced <br /> with the following: <br /> ,a) A Reclamation Plan shall be approved by the County prior to the submittal of the <br /> Development Permit for the wastewater treatment plant. The Reclamation Plan shall include <br /> an engineering report and a schedule for ensuring that the design, construction,and <br /> permitting of the reclamation facilities would be completed prior to the approval of the first <br /> Tentative Map. The Reclamation Plan shall be updated and approved prior to the approval of <br /> specific plans subsequent to Specific Plan I." <br /> (k) Implementation(b)under Objective 1 in Wastewater Reuse Program(Appendix C)should be revised, as <br /> follows: <br /> "b) Specific Plan Requirement. With the exception of Specific Plan I,no specific plan shall be <br /> approved unless guarantee has been provided to the County that sufficient land to meet the <br /> required storage and disposal acreage is under the control of the plan applicant or the <br /> community,and the consent of all agencies which have the legal responsibility to approve <br /> and/or issue permits has been obtained. Alternatively,if sufficient off-site land cannot be <br /> secured,then on-site reclamation shall be practiced to the maximum extent possible. Other <br /> College Park at Mountain House Specific Plan III Draft EIR EDAW <br /> San Joaquin County 4.5-19 Public Utilities <br />