Laserfiche WebLink
future. Major reclaimed water pipelines shall be sized to serve"downstream"areas upon <br /> development." <br /> (p) A new Implementation should be added under Objective 3 in Potable Water Supply and Distribution,as <br /> follows. <br /> "d) On-Site Reclamation. Upon operation of the advanced wastewater treatment plant to produce <br /> reclaimed water suitable for human contact, on-site reclamation with reclaimed water shall be <br /> used to replace potable water to the maximum extent possible. The Community Services <br /> District,and/or other public municipal agencies, shall use reclaimed water for irrigation of <br /> public areas and operations(e.g., equipment/vehicle/bus washing). The Community Services <br /> District shall ensure that industrial and commercial operations that use water for washing or <br /> processing be required to use reclaimed water to the maximum extent possible." <br /> Mitigation Measure M4.4.2-2 <br /> (a) A new Policy should be added to Objectives 4 and 5 in Potable Water Supply and Distribution(Appendix <br /> C), as follows: <br /> w <br /> "Obsolete agricultural irrigation and drainage facilities shall be removed or properly abandoned <br /> upon development of an area." <br /> (b) Implementation(c)under Objectives 4 and 5 in Potable Water Supply and Distribution(Appendix C) <br /> should be revised,as follows: <br /> "c) Farm Drainage Requirements. All Development Permit submittals shall include a report on <br /> the impact on existing farm drainage facilities. The report shall include a map of all existing <br /> farms drains that flow through the area covered by the permit or map, an assessment of the <br /> impact on the drainage system, and a determination of the planned dispossession of the <br /> system. The potential for drains to act as conduits for waste or wastewater to be discharged <br /> to nearby surface waterways shall be eliminated. Drains are to be identified on the maps as to <br /> type,location,and function. Portions of a system that would be abandoned shall be removed <br /> unless they could be incorporated into the storm drainage system" <br /> Mitigation Measure M4.4.2-3 <br /> (a) The following Policies should be added under Objective 1 in Sludge Disposal(Appendix C),as follows: <br /> "b) Beneficial reuse of sewage sludge shall be implemented to the maximum extent possible to <br /> minimize sludge disposal at a landfill or at a dedicated site. <br /> "c) Sludge quality from the project shall not limit sludge reuse options. This shall be <br /> accomplished via effective pre-treatment,public education,recycling programs, and <br /> additional treatment, if necessary." <br /> (b) Implementation(b)under Objective 1 in Sludge Disposal(Appendix C) should be revised,as follows: <br /> .. "b) Interim Disposal. If the sludge meets acceptance criteria of a specific landfill,the sludge <br /> shall be initially disposed of at an appropriately permitted landfill. Sludge shall meet <br /> nonhazardous classification and shall be dried to a minimum of 50 percent solids prior to <br /> disposal at a landfill. The duration of landfill disposal shall not exceed two years from the <br /> startup of the activated sludge treatment process,unless the sludge disposal program <br /> College Park at Mountain House Specific Plan III Draft EIR EDAW <br /> San Joaquin County 4.5-21 Public Utilities <br />