described in Implementation(e)concludes that landfill disposal of wastewater sludge is the <br /> only viable option." <br /> (c) Implementation(e)under Objective 1 in Sludge Disposal(Appendix C) should be revised, as follows: <br /> "e) Initial Wastewater Sludge Disposal Plan. Within one year after the startup of the permanent <br /> secondary treatment process,the Community Service District shall submit an Initial <br /> Wastewater Sludge Disposal Plan to the County and other appropriate agencies for review <br /> and approval. The Plan shall document the sludge characterization findings,a detailed - <br /> impact/benefit analysis of sludge disposal options,and a proposed sludge disposal method for <br /> the duration of the current specific plan." <br /> (d) The following new Implementations should be added under Objective 1 in Sludge Disposal(Appendix <br /> C),as follows: <br /> 'If) Sludge disposal options shall be evaluated as early as possible,not later than one year after <br /> the startup of the permanent secondary treatment process,to allow for early identification of <br /> disposal options. Evaluation shall include sludge characterization, survey of potential sites <br /> where sludge may be used as a soil amendment, and assessment of viability of the compost <br /> market. <br /> "g) In all specific plans where wastewater treatment sludge requires disposal, the specific plans — <br /> shall identify the proposed method(s)of sludge disposal for the duration of the plans. The <br /> CSD may subsequently adopt other sludge disposal options provided the new method(s)will <br /> achieve an equivalent or higher degree of environmental and public health protection, as <br /> determined by the County, and meets all applicable regulatory requirements. The County <br /> shall be notified of the proposed change in disposal method at least six months prior to <br /> implementation of the new disposal method. <br /> "h) If landfill disposal of the wastewater sludge were proposed, an agreement or"will serve" <br /> letter with a landfill that would accept the sludge for at least the next five years shall be <br /> provided with the initial Wastewater Sludge Disposal Plan or subsequent specific plan. If <br /> land spreading or dedicated land disposal were proposed, then guarantees of adequate acres <br /> for sludge disposal for at least the next five years must be provided. Provisions for sludge <br /> disposal shall be updated annually so that there are always firm provisions for disposal for at <br /> least five years into the future." <br /> Mitigation Measure M4.4.2-5 <br /> (a) A new Policy should be added under Objective 1 in Wastewater Reuse Program(Appendix C), as <br /> follows: — <br /> "d) The wastewater treatment and storage pond levees shall be capable of withstanding a <br /> maximum credible earthquake; ponds located within the 100-year floodplain shall prevent _ <br /> inundation due to levee failure along Old River or other nearby waterways,be capable of <br /> withstanding the effects of flooding,and shall not impair the structural integrity of existing <br /> flood control levees." <br /> (b) Two new Implementations should be added under Objective 1 in Wastewater Reuse Program,as follows: <br /> "j) The detailed design of the wastewater treatment and storage pond levees shall be included in <br /> the Reclamation Plan and initial Development Permit for the Wastewater Treatment Plant, <br /> and in all subsequent reclamation plans where additional ponds are proposed. The pond <br /> EDAW College Park at Mountain House Specific Plan III Draft EIR <br /> Public Utilities 4.5-22 San Joaquin County <br />