Laserfiche WebLink
Mountain House Master Plan 1994 <br /> The following natural gas measures and policies from the Mountain House Master Plan are applicable to the <br /> proposed project. <br /> Implementation 8.3a(PG&E Review).Each Specific Plan shall specify land uses and development <br /> standards adjacent to natural gas lines. The County shall submit the Specific Plans to PG&E for review and <br /> comment on any proposed development in the vicinity of natural gas utilities that cross the project site. <br /> Final EIR for the Mountain House Master Plan and Specific Plan 11994 (Mitigation Measures) <br /> There are no mitigation measures identified in the Final EIR for the Mountain House Master Plan and Specific <br /> Plan I applicable to natural gas. <br /> Mountain House Master Plan and Specific Plan I Mitigation Monitoring Program <br /> There are no mitigation measures identified in the Mountain House Master Plan and Specific Plan I Mitigation <br /> Monitoring Program applicable to natural gas. <br /> College Park at Mountain Hc use Specific Plan III 2004 <br /> There are no measures or standards identified in the College Park at Mountain House Specific Plan III applicable <br /> to natural gas. <br /> Final Supplemental EIR for Delta College Center at Mountain House 2002 (Mitigation Measures) <br /> There are no mitigation measures identified in the Final Supplemental EIR for Delta College Center at Mountain <br /> House applicable to natural gas. <br /> Mountain House Community Services District Design Manual 2002 <br /> There are no measures or standards identified in the Mountain House Community Services District Design <br /> Manual applicable to natural gas. <br /> Significant Impacts Identified in the 1994 Mountain House Master Plan and Specific Plan I Final <br /> EIR <br /> The MHMP EIR does not identif},any significant impacts related to natural gas. <br /> 4.5.3 SIGNIFICANCE THRESHOLDS <br /> The project would result in a significant utilities impact if one or more of the following would occur: <br /> • Create a demand for water supply or wastewater-treatment/disposal capacity beyond available capacity or <br /> entitlements; <br /> • Require or result in the construction of new water or wastewater infrastructure treatment/disposal <br /> infrastructure,the construction of which could cause significant environmental effects; or <br /> • Create demands for electrical or natural gas service that is substantial in relation to the existing demands. <br /> EDAW College Park at Mountain House Specific Plan III Draft EIR <br /> Public Utilities 4.5-30 San Joaquin County <br />