Laserfiche WebLink
"e) Preliminary Soils Report.The soils report required for each subdivision shall identify the seasonal high <br /> groundwater level at the site of any detention/retention basins proposed as part of the stormwater _ <br /> management system. The report shall provide recommendations for appropriate design elevations for the <br /> detention/retention basins that would avoid saturation or partial filling by groundwater. The report shall <br /> specifically address the potential for increased groundwater levels caused by removal or disruption of <br /> existing subsurface drains.The report will provide recommendations for subsurface drains for all newly <br /> constructed structures or facilities.These recommendations all include provisions for routing and disposal <br /> of drain discharges that will not result in adverse flooding or saturation hazards within other areas of the <br /> project site." <br /> Mitigation Measure M4.7-6.The following Implementation should be added to the Draft Master Plan under <br /> Objective 2 in Mountain House Creek Improvements(Appendix C): <br /> "A sedimentation basin or other effective sediment control structure shall be designed and constructed near <br /> the point where Mountain House Creek crosses the western project boundary.The basin shall be designed to <br /> effectively remove sediment from the creek flows entering the project site.The basin maintenance shall be the <br /> responsibility of the CSD.The basin design and maintenance program shall minimize the potential for <br /> wetland development in the basin which could hinder the function or maintenance of the structure." <br /> Mountain House Master Plan and Specific Plan I Mitigation Monitoring Program <br /> The following water quality mitigation measure from the Mountain House Master Plan and Specific Plan I <br /> Mitigation Monitoring Program is applicable to the proposed project. <br /> Mitigation Measure 4.74 <br /> (a) Preliminary Soils Report.The soils report required for each subdivision shall identify the seasonal high <br /> groundwater level at the site of any detention/retention basins proposed as part of the stormwater management <br /> system.The report shall provide recommendations for appropriate design elevations for the detentionhetention <br /> basins that would avoid saturation or partial filling by groundwater.The report shall specifically address the <br /> potential for increased groundwater levels caused by removal or disruption of existing subsurface drains.The _ <br /> report will provide recommendations for subsurface drains for all newly constructed structures or facilities. <br /> These recommendations all include provisions for routing and disposal of drain discharges that will not result <br /> in adverse flooding or saturation hazards within other areas of the project site. — <br /> College Park at Mountain House Specific Plan III <br /> Chapter 15 of the College Park at Mountain House Specific Plan III incorporates the provisions of the Mountain House — <br /> Storm Water Master Drainage Plan Update(MHCSD 2003)that relate to the community's storm drain collection <br /> system and stormwater quality management program contained in the SWMP. <br /> The MHMP requires that the storm drain system be designed to reduce the quantity of storm water pollutants as <br /> close to the point of origin as possible,and to incorporate cost effective BMPs treatment processes.To this end, <br /> site-specific and regional treatment BMPs shall be incorporated into the design of all improvements, including all _ <br /> structures and infrastructure. <br /> Final Supplemental EIR for Delta College Center at Mountain House 2002 (Mitigation Measures) <br /> No water quality mitigation measures beyond those adopted for the MHMP were recommended in the EIR for the <br /> Delta College Center. <br /> EDAW College Park at Mountain House Specific Plan III Draft EIR <br /> Water Quality 4.8-8 San Joaquin County <br />