My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004916
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
18353
>
2600 - Land Use Program
>
PA-0500142
>
SU0004916
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2019 9:43:57 AM
Creation date
9/5/2019 10:44:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004916
PE
2638
FACILITY_NAME
PA-0500142
STREET_NUMBER
18353
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
MOUNTAIN HOUSE
ENTERED_DATE
3/17/2005 12:00:00 AM
SITE_LOCATION
18353 W GRANT LINE RD
RECEIVED_DATE
3/15/2005 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\18353\PA-0500142\SU0004916\COLLEGE PRK SP III.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
865
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Implementation 6.7.4.a.Potential hazards shall be identified and avoided as part of the community — <br /> development. Such hazards include abandoned gas exploration wells, and agricultural facilities and <br /> canals. <br /> Implementation 6.7.4.b. State listed bio-accumulative pesticides that exceed soil concentration <br /> thresholds shall be remediated through approved procedures. <br /> Implementation 6.7.4.c.The applicant shall take corrective actions, such as well abandonment and <br /> soil remediation,if required, for all abandoned gas exploration wells or other previously recorded <br /> sources of hazardous and toxic substances on and within 500 feet of the project area to meet County <br /> and state standards. <br /> Implementation 6.7.4.d.The applicant shall take corrective actions for the presence found in excess <br /> of the allowable amounts of any fuel,pesticide,herbicide,or chemical residue on or under the soil _ <br /> that is listed on the state or federal list of toxic materials. Corrective actions shall be conducted in <br /> accordance with the requirements of the County Environmental Health Department and the applicable <br /> state agency. — <br /> Implementation 6.7.4.e.The applicant shall reduce the attractive nuisance such canals may pose <br /> through fencing, signage,restriction of access from the tentative map area or other means. _ <br /> Implementation 6.7.4.E Water wells shall be retrofitted or properly abandoned prior to construction. <br /> Implementation 6.7.4.8.The applicant shall test all existing structures on the project site for lead <br /> content and asbestos-containing building materials prior to demolition and approval of a demolition <br /> permit. If it is found that painted surfaces contain lead-based paint and/or the structures contain <br /> asbestos materials,the applicant shall prepare a Demolition Plan for the safe demolition of all site _ <br /> structures. The Demolition Plan shall address both on-and off-site chemical and physical hazards. <br /> Prior to demolition,the applicant shall remove all hazardous building materials in accordance with all <br /> applicable guidelines,laws,and ordinances. — <br /> • Implementation 6.8.a.Minimum setbacks will be established from the edge of the Rio Oso-Tesla <br /> powerline easement for other uses as follows. _ <br /> • Residential dwelling units 25 feet <br /> • Non-residential structures 10 feet _ <br /> • Parking and storage areas No setback <br /> • Implementation 6.8.b.School Facility EMF Requirements. School sites shall be located an <br /> adequate distance from transmission lines easements to meet the setback criteria adopted by the <br /> California Department of Education as part of the Tentative Map approval process for each phase <br /> which contains a school facility.Easement setbacks at the time of adoption of Specific Plan III are as <br /> follows: <br /> • 50-133 kV line 100 feet <br /> • 220-230 kV line 150 feet — <br /> • 500-550 kV line 350 feet <br /> • Implementation 6.8.c.If a site proposed for development contains an electrical transformer,a — <br /> Development Permit submittal for an application requiring environmental assessment shall include a <br /> letter from PG&E stating whether existing electrical transformers on the site contain PCBs and <br /> EDAW College Park at Mountain House Specific Plan III Draft EIR <br /> Public Health and Safety 4.9-24 San Joaquin County <br />
The URL can be used to link to this page
Your browser does not support the video tag.