Laserfiche WebLink
Implementation 6.7.4.a.Potential hazards shall be identified and avoided as part of the community — <br /> development. Such hazards include abandoned gas exploration wells, and agricultural facilities and <br /> canals. <br /> Implementation 6.7.4.b. State listed bio-accumulative pesticides that exceed soil concentration <br /> thresholds shall be remediated through approved procedures. <br /> Implementation 6.7.4.c.The applicant shall take corrective actions, such as well abandonment and <br /> soil remediation,if required, for all abandoned gas exploration wells or other previously recorded <br /> sources of hazardous and toxic substances on and within 500 feet of the project area to meet County <br /> and state standards. <br /> Implementation 6.7.4.d.The applicant shall take corrective actions for the presence found in excess <br /> of the allowable amounts of any fuel,pesticide,herbicide,or chemical residue on or under the soil _ <br /> that is listed on the state or federal list of toxic materials. Corrective actions shall be conducted in <br /> accordance with the requirements of the County Environmental Health Department and the applicable <br /> state agency. — <br /> Implementation 6.7.4.e.The applicant shall reduce the attractive nuisance such canals may pose <br /> through fencing, signage,restriction of access from the tentative map area or other means. _ <br /> Implementation 6.7.4.E Water wells shall be retrofitted or properly abandoned prior to construction. <br /> Implementation 6.7.4.8.The applicant shall test all existing structures on the project site for lead <br /> content and asbestos-containing building materials prior to demolition and approval of a demolition <br /> permit. If it is found that painted surfaces contain lead-based paint and/or the structures contain <br /> asbestos materials,the applicant shall prepare a Demolition Plan for the safe demolition of all site _ <br /> structures. The Demolition Plan shall address both on-and off-site chemical and physical hazards. <br /> Prior to demolition,the applicant shall remove all hazardous building materials in accordance with all <br /> applicable guidelines,laws,and ordinances. — <br /> • Implementation 6.8.a.Minimum setbacks will be established from the edge of the Rio Oso-Tesla <br /> powerline easement for other uses as follows. _ <br /> • Residential dwelling units 25 feet <br /> • Non-residential structures 10 feet _ <br /> • Parking and storage areas No setback <br /> • Implementation 6.8.b.School Facility EMF Requirements. School sites shall be located an <br /> adequate distance from transmission lines easements to meet the setback criteria adopted by the <br /> California Department of Education as part of the Tentative Map approval process for each phase <br /> which contains a school facility.Easement setbacks at the time of adoption of Specific Plan III are as <br /> follows: <br /> • 50-133 kV line 100 feet <br /> • 220-230 kV line 150 feet — <br /> • 500-550 kV line 350 feet <br /> • Implementation 6.8.c.If a site proposed for development contains an electrical transformer,a — <br /> Development Permit submittal for an application requiring environmental assessment shall include a <br /> letter from PG&E stating whether existing electrical transformers on the site contain PCBs and <br /> EDAW College Park at Mountain House Specific Plan III Draft EIR <br /> Public Health and Safety 4.9-24 San Joaquin County <br />