Laserfiche WebLink
whether there are any records of spills from such equipment. If PCB-containing equipment(50 to 500 <br /> parts per million PCBs in the oil)or PCB equipment(over 500 parts per million) were identified, this <br /> equipment shall be replaced with non-PCB containing equipment prior to construction. Any <br /> identified spill areas shall be evaluated for cleanup. <br /> Implementation 6.9.a. Structures that would be removed or renovated as part of the project shall be <br /> screened or surveyed for the presence of asbestos-containing materials.Removal of structures shall <br /> only occur after obtaining a demolition release form. If asbestos were is present, renovation and/or <br /> demolition shall be undertaken only by licensed asbestos abatement contractors trained in proper <br /> asbestos removal and disposal procedures. <br /> Implementation 6.9.b.A demolition permit approved by the Community Development Department <br /> and Environmental Health Department shall be required prior to all proposed building demolition. <br /> Implementation 6.10.a.All drainage basins,corridors and other potential standing water areas shall <br /> be designed to comply with the requirements of Master Plan Appendix 6-A or more current standards <br /> required by the MHCSD in coordination with the San Joaquin County Mosquito Abatement District. <br /> Final Supplemental EIR for Delta College Center at Mountain House 2002 (Mitigation <br /> Measures) <br /> The following relevant public health and safety mitigation measures from the Final Supplemental EIR for <br /> Delta College Center at Mountain House are applicable to the proposed project. <br /> Mitigation Measure 4.9-1.The following combination of measures shall be implemented: <br /> �. a. Before any construction activities which would include excavation in 500 feet of the crude oil <br /> pipeline north of the site,the applicant [College] shall prepare a preliminary site assessment.The <br /> site assessment shall be prepared by a qualified professional in compliance with the requirements <br /> of the State Fire Marshal. If contamination is identified, investigation and remediation shall be <br /> undertaken by Chevron in accordance with the requirements of the State Fire Marshal and the <br /> RWQCB before construction. <br /> b. Before any site work that would involve grading or construction in 500 feet of the crude oil or <br /> natural gas pipelines, development plans shall be submitted to the pipeline owner(Chevron, <br /> PG&E) for review and approval. The owner shall be responsible for ensuring that the operation <br /> and condition of the pipelines are in compliance with State Fire Marshal regulations for proposed <br /> land uses on and adjacent to their easements. <br /> Mountain House Community Services District Design Manual 2002 <br /> There are no measures or standards identified in the Mountain House Community Services District <br /> Design Manual applicable to Public Health and Safety. <br /> SIGNIFICANT IMPACTS IDENTIFIED IN THE MOUNTAIN HOUSE MASTER PLAN AND SPECIFIC <br /> PLAN I FINAL EIR <br /> The MHMP EIR identified the following significant public health and safety impacts before mitigation <br /> associated with implementation of the MHMP: <br /> College Park at Mountain House Specific Plan III Draft EIR EDAW <br /> San Joaquin County 4.9-25 Public Health and Safety <br />