My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004916
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
18353
>
2600 - Land Use Program
>
PA-0500142
>
SU0004916
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2019 9:43:57 AM
Creation date
9/5/2019 10:44:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004916
PE
2638
FACILITY_NAME
PA-0500142
STREET_NUMBER
18353
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
MOUNTAIN HOUSE
ENTERED_DATE
3/17/2005 12:00:00 AM
SITE_LOCATION
18353 W GRANT LINE RD
RECEIVED_DATE
3/15/2005 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\18353\PA-0500142\SU0004916\COLLEGE PRK SP III.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
865
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
extending between Mountain House and the City of Lathrop,including the necessary multi jurisdictional <br /> alternative/feasibility studies." According to a recent news report,the River Islands project in Lathrop will be <br /> funding a portion of the proposed Golden Valley Expressway north of the heavily congested I-205. _ <br /> Mountain House Master Plan and Specific Plan I Mitigation Monitoring Program <br /> Most of the mitigation measures in the MHMP EIR and Specific Plan I were addressed through changes to the <br /> MHMP.The mitigation monitoring program included the following transportation measure that is applicable to <br /> the proposed project: <br /> ► Mitigation Measure M4.12-3.Interchange improvements on I-205 and on I-580 (west of I-205 junction) <br /> should provide for ramp metering with HOV bypass lanes. <br /> College Park at Mountain House Specific Plan 111 2004 <br /> No transportation policies beyond those adopted with the MHMP were recommended in this plan document. — <br /> Final Supplemental EIR for Delta College Center at Mountain House 2002 (Mitigation Measures) <br /> The following transportation mitigation measures from the Final Supplemental EIR for Delta College Center at <br /> Mountain House are applicable to the proposed project. <br /> ► Mitigation Measure 4.12-1.The District shall contribute its proportionate fair share cost of constructing the — <br /> following interim improvements: <br /> An additional protected left tum(dual left-turn lanes)at the I-205 eastbound ramp <br /> A westbound-to-northbound channelized free right-tum lane at the I-205 westbound ramp <br /> ► Mitigation Measure 4.12-2(a).The District shall pay its proportionate fair share cost of the transportation _ <br /> improvement fees(MHTIF)to the MHCSD and the traffic impact mitigation fees(TIMF)to San Joaquin <br /> County.Payment of these fees shall begin upon approval of the annexation agreement between the District <br /> and the MHCSD and shall be paid on a project phasing basis. <br /> Mitigation Measure 4.12-2(b).Prior to the construction of Phase H(and each subsequent phase of project <br /> development),the District shall undertake a traffic study that includes traffic counts and identifies roadway <br /> improvements needed based on project-generated traffic. The District shall coordinate with the MHCSD and <br /> the County to identify planned roadway improvements within the project area.The District shall pay its <br /> proportionate fair share cost of the identified roadway improvements. <br /> ► Mitigation Measure 4.12-2(c).The District shall participate in improved transit programs to reduce trip <br /> generation as identified in Mitigation Measure 4.13-1(a) and(b)of the Air Quality section of this SEIR. <br /> ► Mitigation Measure 4.12-3.The District shall implement applicable portions of Mitigation Measure 4.12-2 <br /> through M.4.12-3 of the 1994 FOR and shall participate in a proportionate fair share cost of freeway project <br /> funding. With implementation of the 1994 FEIR traffic mitigation measures,the impact would remain <br /> significant and unavoidable. <br /> ► Mitigation Measure 4.12-4.The District shall contribute its proportionate fair share cost for additional <br /> improvements recommended in the PSR,i.e.the proposed I-205/Mountain House Parkway. -- <br /> Mitigation Measure 4.12-6.The project shall contribute its proportionate fair share cost to the Mountain <br /> House Master Plan freeway mitigation measures(Mitigation Measures M.4.12-3);however,identified Master — <br /> EDAW College Park at Mountain House Specific Plan III Draft EIR — <br /> Transportation 4.11-14 San Joaquin County <br />
The URL can be used to link to this page
Your browser does not support the video tag.