Laserfiche WebLink
t I ! f f I 1 f 1 t t t If I t ( f t t <br /> Cn n <br /> N 0 <br /> w Table 4.11-18(continued) <br /> = w 2025 Cumulative With-Project Mitigation Measures <br /> Required Required Under <br /> Initialo RoadwaySe Mitigation Measures Identifield in by MHTIF/ Current Analysis Proposed <br /> Segment g MHMP EIR County of 2025 Buildout P lro�ect <br /> w. TIMF Conditions <br /> s <br /> o and the City of Lathrop's,including the necessary multi- <br /> N jurisdictional alternative/feasibility studies. <br /> `D Trigger:As warranted <br /> Responsibility:Defined by MHTIFICounty TIMF/O set Program <br /> 10. PSR for Grant Lineq-580 Mitigation Measure M4.11-3(MHMP EIR) ✓ ✓ ✓ ✓ <br /> M interchange improvements (1) Conduct Grant Line Road PSR <br /> (2) Provide for ramp metering with HOV bypass lanes. <br /> Trigger:As warranted. <br /> Responsibility: Beyondfair share ofproject as defined in <br /> x <br /> MHTIFICounty TIMFlOffset Program <br /> To 11. Several roadways in other Mitigation Measure M4.11-4(MHMP EIR) ✓ ✓ ✓ ✓ <br /> jurisdictions Fair share participation in traffic studies and improvement measures to <br /> include Eleventh Street and Grant Line Road(east of Mountain House <br /> ? Parkway)(City of Tracy),Mountain House Parkway(Alameda County), <br /> and Byron Highway(Alameda and Contra Costa counties).Where <br /> w roadway widening for additional capacity is not feasible or acceptable, <br /> safety and operational improvements should be considered in order to <br /> better accommodate increased traffic. <br /> Trigger:As warranted by MHCSD <br /> Responsibility:Defined by MHTIFICounty TIMF/O set Program <br /> 12. Connection to off-site Mitigation Measure M4.11-7(M1flV1P EBR) ✓ ✓ ✓ ✓ <br /> bicycle facilities Contribute fair share in the planning and implementation of off-site <br /> bicycle facilities on and connecting with regional bike routes designated <br /> on the County Regional Bicycle Plan within five miles of the project, <br /> including those along Grant Line Road,Mountain House Parkway, <br /> Byron Road,Schulte Road,and the Edmund G.Brown Aqueduct. <br /> Trigger:As warranted by MHCSD <br /> Responsibility:Defined by MHTIFICounry TIMF/O set Program <br /> Note: <br /> The timing of the improvements to be determined by the annual Traffic Monitoring program. <br /> The MHMP requires that the Mountain House community developers mitigate their fair share of transportation Impacts through participation in: <br /> • Payment of a MHCSD Transportation Improvement Fee(MHTIF)and <br /> Participation in the County's TIMF/Offset program,which includes a fee component for regional roadway improvements,alternative modes of travel,and SJCOG fee. <br /> °Fair share'means the community's obligation to participate in the construction/funding for an improvement that will be shared by other jurisdictions. <br /> iz The Mountain House community's obligation shall be as presented in adopted MHTIF/County TIMF/Offset Program and Master Plan Development Agreement. <br /> a All the above mitigation measures may be triggered by either College Park or other developments in the MHMP area. <br /> 0 rn Source: TJKM <br /> D <br /> o � <br />