Laserfiche WebLink
--I m <br /> � D <br /> S Table 4.11-18 <br /> w <br /> 2025 Cumulative With-Project Mitigation Measures <br /> Initially Required Required Under Part of <br /> Roadway Segment Mitigation Measures Identified in by MHTIF/ Current Analysis Proposed <br /> MHMP EIR County of 2025 Buildout Project <br /> TIMF Conditions <br /> 1. Grant Line Road from Widen to four lanes ✓ ✓ ✓ ✓ <br /> Mountain House Parkway to Trigger:Approximately 5,700 to 6,360 units of Mountain House <br /> Great Valley Parkway Responsibility:Mountain House Community Developers <br /> 2. Grant Line Road from Great Widen to four lanes ✓ ✓ ✓ ✓ <br /> Valley Parkway to I-580 Trigger:Approximately 5,700 to 6,360 units of Mountain House <br /> Responsibility:Mountain House Community Developers <br /> 3. Grant Line Road from Widen to four lanes ✓ ✓ ✓ ✓ <br /> Mountain House Parkway to Trigger.:Approximately 5,700 to 6,160 units of Specific Plan 111 <br /> Byron Road Responsibility:Mountain House Community Developers <br /> 4. Mountain House Parkway Widen to six lanes ✓ ✓ ✓ ✓ <br /> (south of Mascot Boulevard Trigger:Approximately 14,000 units of Mountain House <br /> to Von Sosten Road) Responsibility:Mountain House Community Developers <br /> 5. Byron Road from south of Widen to four lanes ✓ ✓ ✓ ✓ <br /> > Central Parkway to Trigger:Approximately 7,000 to 8,000 units of Mountain House <br /> Mountain House Parkway Responsibility:Mountain House Community Developers <br /> 6. Byron Road from south of Widen to six lanes ✓ ✓ ✓ ✓ <br /> Central Parkway to Trigger:Approximately 14,000 units of Mountain House <br /> n Henderson Road Responsibility Mountain House Community Developers <br /> 7. Mountain House Parkway Widen to six lanes ✓ ✓ ✓ ✓ <br /> from south of Von Sosten Trigger:Approximately 9,000 units of Mountain House <br /> Road to the I-205 freeway Responsibility:Mountain House Community Developers <br /> 8. Mountain House Parkway Widen to eight lanes ✓ ✓ ✓ ✓ <br /> from south of Von Sosten Trigger:Approximately 12,000 units Mountain House <br /> o Road to the I-205 freeway Responsibility:Mountain House Community Developers <br /> 9. Widening of 1-205 Mitigation Measure M4.11-2(MHMP EBR) ✓ ✓ ✓ ✓ <br /> (1) Contribute fair share of I-205 widening from four lanes to six lanes <br /> X <br /> (funded),and from six lanes to eight lanes between I-580 and 1-5, <br /> either as HOV lanes or mixed flow lanes <br /> v> (2) As an alternative,the project sponsor shall contribute a fair share to <br /> -9 safety and operational improvements and/or to the widening of <br /> m Altamont Pass Road west of Grant Line Road to four lanes(as HOV <br /> or truck lanes),if determined to be consistent with Alameda County <br /> policy. <br /> (3) Contribute fair share to the development of a parallel east-west <br /> roadway system north of I-205 extending between Mountain House <br /> c m <br />