Laserfiche WebLink
Table 6-1 (continued) <br /> List of Key Past Projects <br /> Project Name Description <br /> Grant Line Village Existing 54-acre residential neighborhood containing 55 residences. <br /> r. Byron-Bethany Irrigation District(BBID)irrigation Two existing BBID irrigation canals. <br /> canals <br /> Delta-Mendota Canal Large water conveyance canal jointly operated for the Central Valley <br /> r„ Project and State Water Project. <br /> Pacific Gas and Electric Company(PG&E)and Two large existing high-pressure natural gas and crude oil pipelines <br /> Chevron easements and pipelines and a 230-kilovolt overhead electric transmission line. <br /> Central Valley Regional Water Quality Control Provides authorization for the MHCSD to discharge 5.4 mgd of <br /> Board Permits—National Pollutant Discharge treated wastewater into Old River on a year-round basis and for land <br /> Elimination System(NPDES) disposal of an additional 2.6 mgd of treated wastewater. <br /> ., Modesto Irrigation District(MID)Substations Leased substations,including the Herdlyn Substation providing <br /> electrical feed from the PG&E grid. <br /> Source:EDAW 2005 <br /> r <br /> Table 6-2 <br /> List of Key Present and Reasonably Foreseeable Future Projects <br /> Project Name Brief Description <br /> Mountain House Specific Plan I Includes 582 acres of residential and commercial/industrial use. <br /> Approved in 1994 and currently under construction. <br /> Mountain House Specific Plan II Includes 2,302 acres of residential,commercial,industrial,and <br /> educational uses.Approved February 2005. <br /> Mountain House Business Park(part of Specific Includes 285 acres of commercial/industrial use.Approved in 1994 <br /> Plan I) as part of Mountain House Specific Plan 1. <br /> Interstate 205 (I-205)/Mountain House Parkway I-205 interchange improvements at Mountain House Parkway. <br /> r, Interchange Project Study Report Approved and under construction.To be completed in 2007. <br /> Mountain House Parkway Improvement Project Proposed widening of Mountain House Parkway to four lanes. <br /> Approved and under construction.To be completed in 2007. <br /> Mountain House Creek Improvement Project Drainage project providing storm drains from Specific Plan I to <br /> (MHCIP) Mountain House Creek and a stormwater quality basin north of <br /> Byron Road.Intended to enhance capacity of Mountain House Creek <br /> through creek and bank improvements.A portion of the project is <br /> under way with the remainder to be completed when Specific Plan H <br /> occurs north of Byron Road.To be completed in 2010. <br /> Mountain House W WTP Expansion Project Current capacity is capable of serving existing portions of the <br /> Specific Plan I area.Ultimate expansion to 5.4 million gallons per <br /> day(mgd)is planned for 2006/2007.Initial phases have been <br /> completed. <br /> + Mountain House WTP Expansion Project Two expansions would increase plant capacity from 1.7 mgd to 11.9 <br /> mgd,then ultimately to 17.1 mgd.Initial phases have been <br /> completed. Completion is expected in 2006. <br /> BBID Raw Water Pipeline Nonpotable(raw water)supply of 60 acre-feet per year would be <br /> provided to the project for landscape irrigation via a new pipeline <br /> from BBID's Canal 155. <br /> BBID New Pumps at Mountain House WTP New pumps at the Mountain House WTP pumping station would be <br /> required when the expansion of the WTP occurs. <br /> College Park at Mountain House Specific Plan III Draft EIR EDAW <br /> San Joaquin County 6-3 Cumulative Impacts <br />