Laserfiche WebLink
College Park at Mountain House Specific Plan M <br /> MfEigation Monitoring and Reporting Program <br /> Implementation Implementation&Verification <br /> Mitiga#ion Measure Timing/Schedule Responsibility Action Date <br /> Completed <br /> 41 LAND USE <br /> 41-1 Laud 1,Jw-and Agrliculte;re--Conflict with Existing Before and during San Joaquin County <br /> Lind Uses construction,and Community <br /> The College.Park developers shall implement the During design phase Development <br /> following measures: Dgmtment <br /> < Fence off.the two on-site,Byron-Bethany. (STCCDI)),in <br /> Irrigation Pict(BBIA)canals from proposed conjunction with the <br /> �. urban d1evelopmont until such time as the canals developer,and in <br /> are filled.The fencing shall be sufficient to block coordination with <br /> access to the canals by'all'except BBID BBID <br /> personnel and.other*utliorized pegs,and shall <br /> be devel"ed in cooidinatim with BBID to <br /> ensure that BBID leas tontimwd access to the <br /> oanals for mainkmance activities. <br /> < Implement Mitigation Measure 4.9-5,identified <br /> in Section 4.9,`Alb&Health and Safety,"to <br /> ensure that the proposed real lmm an not <br /> exposed to an explosion humd from the natural <br /> n gas pipeli ws V449n the PG&ffi— evron <br /> easem ew that bisects the project site. <br /> < Idau fyas agricultaral buffer of no lees than 100 <br /> 3 feet stabs time of Tentative MV approval for <br /> any new units in the residential area in and south <br /> of Grant Uric Village and adjacent to the County <br /> 1�. <br /> -n <br /> M <br /> v <br />