My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006455
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
18353
>
2600 - Land Use Program
>
PA-0600641
>
SU0006455
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2019 8:55:51 AM
Creation date
9/5/2019 10:44:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006455
PE
2611
FACILITY_NAME
PA-0600641
STREET_NUMBER
18353
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
209450014 15
ENTERED_DATE
3/1/2007 12:00:00 AM
SITE_LOCATION
18353 W GRANT LINE RD
RECEIVED_DATE
2/26/2007 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\18353\PA-0600641\SU0006455\MISC.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Km <br /> � g <br /> College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> Implementation Implementation&Verification <br /> Mitigation Measure riming/ScheduleResponsibility Action Completed <br /> Date <br /> 4.24 Land Use and Agriculture-conflict Substandany After discontinue SJCCDD,in <br /> with Existing Agricultural Zoning or Williamson of interim land conjunction with the <br /> Act Contracts disposal developer <br /> The project applicants."ll implement the following <br /> mitigation measure: <br /> < At such time as the interim laud disposal of <br /> treated wastewater at the Pombo property is <br /> discontinued,GNK,LLC shall remove the 30- <br /> acre storage pond and restore the storage-pond <br /> site to agricultural use(Le.,feed crops). <br /> 4.2-5 Land Use and Agriculture-=Conflicts with Before construction SJCCDD,in <br /> Adjacent Agricultural Operations . conjunction with the <br /> 441- < " Before development,the project developers shall developer,and in <br /> provide for the continued provision of irrigation coordination with <br /> water to downstream agriculture reliant on the BBID <br /> water from the canals by the installation of <br /> pipelines and"other means.The filling of the <br /> irrigation canals shall be approved by BBID. <br /> 4.6 CULTURAL RESOURCES <br /> 4.6-2 Cultural Resources--Potential During construction SJCCDD,in <br /> Destruction/Damage to Undiscovered.Cultural conjunction with the <br /> Resources developer,and in <br /> If discovery of unknown cultuital matmials is made conjunction with <br /> during ronatruction,.ground-disturbing activities at qualified <br /> the conson site where the discovery was made archaeologist,if <br /> shall be halted.The College Park developers or needed. <br /> construction.contractor shall contact the San Joagwn <br /> County Community Development Department <br /> (SJCCDD)immediately,and a qualified professional <br /> archaeologist acceptable to County staff shall be <br /> notified and retained by the College Park developer. <br /> The archaeologist shall determine whether the <br /> resource represent a"unique archaeological <br />
The URL can be used to link to this page
Your browser does not support the video tag.