Laserfiche WebLink
Colilege Park at MonntWn Home SpeMc Plan III <br /> Mitigation Monitoring and Reporting Program <br /> Implementation&Verification <br /> Mitigation Measure_ Timingfthedule IMPW <br /> R ponsibili�'ty Action Date <br /> Completed <br /> employing one of several methods outlined in <br /> Section 5.2.4.15 of the SJMSCP.These include <br /> retention.of tall vegetation,regular discing of the <br /> site,or usd of chemicals or traps to kill ground <br /> ► Pre-canatrWtionsmeys for borrowing owls <br /> shall be conducted where project construction <br /> a� activities would occur within 75-meters of <br /> suitable habitat(based on SJCOG review).The <br /> survey shall be conducted within 2 weeks of the <br /> beginning of construction If burrowing owls are <br /> found,the following measures shall be <br /> moplemented: <br /> • During the noOreediAg season(September 1 <br /> through January 31),burrowing owls <br /> occupying the project site shall be evict <br /> from the:project site by passive relocation,as <br /> described in the DFG's Staff Rgwrt on <br /> Berrrmdng Owls(DFG 1995). <br /> • During the big season(February 1" <br /> through August A 31) occupied <br /> , burrows shall <br /> not be disturbed and shall be provided with a <br /> " 250-foot protective buffer until and unless <br /> �► thr Technical Advisory f onk itteti,with the <br /> concurrence ofthe pdrnnittir aOcies, <br /> repres ni adves on the Technical Advisory <br /> Committee,or a qualified biologist approved <br /> by the permitting agencies,verifies through <br /> noninvasive means that either(1)the birds <br /> have not begun egg laying or(2)juveniles <br /> M from the occupied burrows are foraging <br /> oB a independently and are capable of <br /> 3 independent survival.After the fledglings <br />