Laserfiche WebLink
M <br /> College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> ImplemenWw Implementation&Verification <br /> Mitigation Measure Timing/Schedule sibi1. Date <br /> Respon dY Action Completed <br /> are capable of independent survival,the <br /> burrow can be destroyed. <br /> 4.10-6 Biological Resources—Conversion off 6inunon Before and during SJCOG,in <br /> Nesting Raptor Habitat and Possible'Loss of construction consultation with DFG <br /> JI <br /> -p Active Nests <br /> < The College Park developers shall request <br /> coverage under the SJMSCP,and fees shall be <br /> paid in the amount determined by SJCOG during <br /> the application and review process for each <br /> project under College Park.Potential nest sites <br /> for all tree-nesting species are scattered <br /> throughout much of the College Park site,but are <br /> °o concentrated along Grant Line Road and at Grant <br /> Line Village.Suitable nesting habitat for <br /> northern harrier is provided by all field crops and . <br /> fallow fields.During the SJMSCP application <br /> process,-SJCOG will determine whether that <br /> specific project site supports suitable nesting <br /> habitat.If SJCOG determines suitable habitat is <br /> present on or adjacent to a given project site,the <br /> SJMSCP incidental take avoidance-and <br /> minimization measuma described below for <br /> nesting raptors shall be implemented.Additional <br /> measures below shall be implemented to avoid <br /> lossof active nests of common raptor species, <br /> which are not covered under the SJMSCP but are <br /> pnM . <br /> ftcf l under the California Fish and Game <br /> Code.The project applicants shall retain <br /> qualified biologists to conduct all pre- <br /> construction surveys. <br /> < White-tailed Kite.If project construction begins <br /> _ during the nesting season(February 15– <br /> September 15),pre-construction surveys shall be <br />