Laserfiche WebLink
r, mv <br /> � a <br /> College Park at Mountain House Specific Plan M <br /> Mitigation Monitoring and Reporting Program <br /> Implementation Implwnentation&Verification <br /> Mitigation Measure Timing/ScheduleResponsibility pin Date <br /> a3 Completed <br /> daring the nesting season(February 15-August <br /> 31),pre-constructiofr surveys shall be conducted <br /> daring the nesting season m suitable nesting <br /> habitat within500 f6d of areas of project <br /> as activity.The survey shall be of <br /> within <br /> the 2 weeks before construction or tree removal <br /> begins.If any active nests are fourA a setback of <br /> 200 feet from each nest shall be established and <br /> maintained during the nesting season for the <br /> period encompassing nest building and <br /> continuing until fledglings leave nests.This <br /> setback applies whenever construction or other <br /> ground4isturbing activities must begin during <br /> the nesting season in the presence of nests that <br /> are known to be occupied.Setbacks shall be <br /> marked by brightly colored temporary fencing. <br /> 4.10-7 Biological Resources—conversion.of Other Before constriction SJCOG,in <br /> Spedal-Status Neffi ft Bird Habitat and Possible (surveys sball be consultation with DFG <br /> m Loss of Active Nests conducted 2 weeks <br /> IThe College Park developers shall request coverage prior to construction <br /> st under the SJMSCP,and fees shall be paid in the activities) <br /> amount de'ft=ned by SJCOG during the application <br /> and review process for each project under College <br /> Park.During the SJMSCP applicatianprocess, <br /> SJCOG will determine whether that specific project <br /> site supports suitable habitat for loggerhead shrike, <br /> California horned lark,or tricolored blackbird.If <br /> 4- SJCOG determines suitable habitat is present on or <br /> adjacent to a given project site,the following <br /> SJMSCP Incidental take avoidance and minimizaapn <br /> measures shall be implemented by the project <br /> applicants in consultation with a qualified biologist.. <br /> < Loggerhead Shrike.If project construction <br />