Laserfiche WebLink
College Park at Mountain Hoare.Specific Plan M <br /> Miltigation Monitoring and Reporting Program <br /> 3 Implementation&Vedkafion <br /> Mitigation Measure TimingfSt edule l Responsibility Action Cotedon m <br /> p <br /> conducted to investigate all potential nesting <br /> trees on the pi? jest site(e.g.,especially tree-tops <br /> 15-59 feet above theuqd in ow, <br /> eucalyptus,cottonwood,or other deciduous <br /> trees),whoever white-tpled kms are,noted on- <br /> site or within the vicinity of the site during the <br /> nesting season.A setback of 100 feet from white- <br /> tailed kite nesting areas shall be established and <br /> maintained,during the nesting season for the <br /> period 4sing st <br /> ng <br /> Ca miringedglings vde nests.This <br /> setback"applie whenever construction or other <br /> j Vvei stttrbing activities nnMbegm during <br /> the hesting'season in tie presence of nests that <br /> are known to be occupied Setbacks shall ba <br /> marked by brightly colored tiemporary fencing. <br /> < Nortbern$srrler.If project construction begins <br /> during the nesting season(February 15--August <br /> 31),*e-constntction surveys shall be conducted <br /> during&:nesting season in suitable nestling <br /> habitat within 500 feet of Areas of project <br /> activity.The survey shall be conducted within <br /> the 2 weeks before construction begins.A <br /> setback of 500 fief from northcstL harrier nesting <br /> areas shall be established and maintained during <br /> the nesting season for the period encompassing <br /> X nest building and continuing until fledglings <br /> leave nests.This setback applies whenever <br /> construction or other ground-disturbing activities <br /> must begin during the nesting season in the <br /> presence of nests that are known to be occupied. <br /> M <br /> Setbacks shall be marked by brightly colored <br /> ' g temporary fencing. <br /> < Common Raptors.If project construction begins <br />