Laserfiche WebLink
College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> � <br /> Implementation&VerihCation . <br /> Mitigation Measure Timing/ScheduleImple entallio Pucljon Data <br /> Resp* Completed <br /> land uses,the operation of on-site landscape <br /> maintenance equipment shall be limited to the <br /> least noise-sensitive periods of dic day,between <br /> the hours of 7:00 a.m.and 10:00 pan. <br /> 4.13-3 Noise--Increased Traffic Noise After construction. SJCCDD,in <br /> The project applicants shall implement the measures conjunction with the <br /> idemifid below. . developer <br /> < Before occupancy of the first residence at <br /> College Park,a noise barrier shall be constructed <br /> by the College Park developers between the five <br /> existing residences located on tho.north side of <br /> Grant Line Road,between CenualTarkway and <br /> ZA the Alameda County line(Receptor 14 in Figure <br /> 4.13-2 of the TAR)and the northern travel.lane of <br /> Grant Line Road The now barriers may consist <br /> of.a wall,berm,or,combination thereof.The <br /> exact location,height,and character of the,noise <br /> ban*shall be dcterm by a noiseconsultant <br /> ► approved by the Cody.:The sound barmier shall <br /> redum outdoor noise levels at the center:of the <br /> firm yard of the five existing.residues to <br /> bellow 65 dBA L,dn/CNEL:if Grant Linc Road is <br /> widened at this location subficq nt.to <br /> constructian of the sound barrier but before <br /> removal of the five residences under Specific <br /> Plan JL the sound.barrier shall be relocated,as <br /> require&ifthofive,existing residences are <br /> removed under Specific Plan H before occupancy <br /> of the fust residence under the College Park <br /> project,fts mitigation measure shall not require <br /> M implementation..This mitigation shall be funded <br /> y " through fair-share payments by the Coilege,Park <br /> developers. <br />