Laserfiche WebLink
� o <br /> � a <br /> College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> Implementation Implementation&Verification <br /> M�Ygation hAeasure 'riming/ScheduleResponsibility �� Date <br /> Completed <br /> 4.13-4 Noise—CozupadWJIty:of Proposed Lewd uses After construction sJCCDD,in <br /> exceeding.Predicted Noise Levels conjunction with the <br /> The College-Park developers,shall implement the developer;in <br /> following measures: consultation with a <br /> < Traffic Noise—Arterials.Before occupancy of qualified acoustical <br /> the fust residence proposed under the College consultant <br /> Park project along each of the seven arterial <br /> seginmits identified in Table 4.13-11 of the BIR, <br /> a sound barrier shall be-constructed by the <br /> College Park developers along that arterial <br /> segment.The noise barrier may consist of a wall, <br /> berm,or combination thereof.The exact location, <br /> height and character of the sound barrier shall be <br /> determined by a noise consultant approved by the <br /> County.The sound barrier shall reduce outdoor <br /> noise levels at the center of backyards of <br /> proposed adjacent single-family residences to <br /> below 65 dBA L&,/CNEL and as close.to 60 dBA <br /> L&ICNEL as feasible.This mitigation shall be <br /> funded through fair-share payments by the <br /> College Park developers. <br /> �i <br /> 3' <br />