Laserfiche WebLink
� m <br /> a <br /> College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> Implementation Implementation&Verification <br /> Mitigation Measure TiminglSchedule Responsibility ActionDate <br /> Completed <br /> levels exceed 60-MA Ld./CNEL.As a result,a <br /> Tide 24 analysis shall be prepared as part of the <br /> final design of any proposed mad fatoily <br /> residential dwellings.To do ex ti nt necessary, <br /> noise control measures shall be-designed <br /> V according to the type of bolding co nstntction and <br /> specified sound rating for each building element to <br /> achieve an interior noise level of 45-OBA <br /> 1*/CNEL. <br /> For any subdivisions for which the County <br /> Building Department and/or associated noise <br /> studies discussed above determine that <br /> Go agricultural noise from existing agricultural <br /> operations could exceed the County's interior or <br /> exterior noise standards of 65 dBA`Ldn/CNEL <br /> and 40 dBA Ldn/CNEL,respectively,a <br /> disclosure statement shall be included in the sales <br /> or rental documents for residences indicating that <br /> the residence could potentially be subject to <br /> periodic agricultural activity noise above County <br /> I standards. <br /> 4.14 VISUAL QUALM <br /> 4.141 Visual QualltyAt6trstion of Visual Character During construction MHCSD <br /> along Grant'Line Road tem 1rae Removal <br /> The College Park developers shall provide new trees <br /> on both sides of Grant Line Road and'ih the median <br /> strip,from Mountain,House Park"y to the Alameda <br /> County line,at a 3:1 ratio to the trees to be removed, <br /> • or as required by.the Mountain House Community <br /> Services District WCSD)Design Manual, <br /> whichever is greaten.The trees to be planted shall be <br /> in conformance with the MHCSD Design Manual, <br /> Chapter 3,for Grant Line Road. <br />