Laserfiche WebLink
College Park at Mountain House SpeMe Pbw IN <br /> Mitigadoa Monitoring and Reporting Program <br /> ' Implementation&VeffkAon <br /> Mitigation Measure Timing/Schedule Implementation Date <br /> Responsibility Acton <br /> Completed <br /> 4.14-2 Visual QusHty—Alteration of a Scenic Vista from During and after MHCSD <br /> oMountain House Parkway construction <br /> The following measures shall be implemented by the <br /> College Park developers: <br /> < If the landscaping and edge treatments required <br /> by the MFW and MHCSD Design.Manual have <br /> not been developed on the east side of Mountain <br /> j House Parkway frontmg the Pombo property by <br /> —__ Specific Plans I or II at the time the proposed <br /> pond is developed on the Pombo property,the <br /> required landscaping and edge treatments on the <br /> east side of Mountain House Parkway in the <br /> C vicinity of the proposed pond shall be installed <br /> by the College Park developers.This shall be <br /> done concurrent with development of the pond. <br /> If the aboveground pond option is developed,the <br /> west facing pond berm shall be densely landscaped <br /> by the College Park developers.Ea addition,the berm <br /> shall be constructed by the College Park developers <br /> using contoured and rounded slopes to avoid angular <br /> face slopes.This shall be done concurrent with <br /> development of the pond <br /> m <br /> az <br /> CL <br /> rn <br /> 3: <br /> � m <br /> v <br />