Laserfiche WebLink
W <br /> W c <br /> o m College Park at Mountain House Specific Plan III <br /> v Mitigation Monitoring and Reporting Program <br /> o Implementation <br /> Implementation&Verification <br /> o Mitigation Measure TiminglSchedule Responsibility Action Date <br /> Completed <br /> WD With-Project Conditions on Anticipated Network <br /> x For consistency with previously adopted roadway <br /> astandards,the County shall extend the standard of <br /> CD LOS D to the segment of Byron Road east of Grant <br /> -o Line Road. <br /> co <br /> 0 Because Byron Road is a major regional arterial <br /> serving the area,the County shall extend <br /> a) implementation of Mountain House Master Plan <br /> (MHNfP)EIR mitigation measure 4.12-5(e)to apply to <br /> Byron Road east of Grant Line Road. <br /> 4.12. AIR QUALITY <br /> 4.12-1 Air Quality—Generation of Temporary,Short- Before construction SJVAPCD,in <br /> Term Construction Emissions of Criteria Air begins and during conjunction with the <br /> Pollutants construction developer <br /> The College Park developers shall implement the latest <br /> version of the SJVAPCD construction-emissions <br /> K control measures during construction(see"Regulatory <br /> — Setting,"above). <br /> The latest version of the San Joaquin Valley Air <br /> o' Pollution Control District(SJVAPCD)control <br /> measures are included in the Guide for Assessing and <br /> Mitigating Air Quality Impacts(SJVAPCD 1998)and <br /> repeated in the"Regulatory Setting"subsection.The <br /> SJVAPCD periodically revises its control measures. <br /> Development under College Park would be required by <br /> C- the SJVAPCD to implement the current version of the <br /> CDmeasures at the time individual development <br /> o applications are received by the County for <br /> development under College Park. <br /> 4.12-2 Air Quality—Potential Generation of Toxic Air Before construction SJVAPCD,in <br /> co Q Contaminants(TACs) begins and during conjunction with the <br /> 3 ► Asbestos—The College Park developers shall construction developer <br /> implement Mitigation Measure 4.9-1. <br />