Laserfiche WebLink
Km <br /> t� <br /> n <br /> College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br />--T--�2 —�-�lmplementation-&-Verification <br /> a Mitigation Measure Timing/Schedule Implementation Date <br /> =3. Responsibility Action <br /> CM Completed <br /> W <br /> ► Mobile-Source TAC Emissions—The College <br /> Park applicants for industrial or commercial land <br /> -v uses shall coordinate with the SJVAPCD to <br /> assess situations in which toxic risk from diesel <br /> cn particulate matter(PM)may occur and to review <br /> 0 <br /> methodologies that may become available to <br /> estimate the risk.The developers shall implement <br /> E3 any project-level measures adopted by the <br /> SJVAPCD to reduce mobile-source TACs <br /> emissions. <br /> 4.12-3 Air Quality—Possible Temporary and Occasional Before and during SJCCDD,in <br /> Exposure of New Sensitive Uses to Odors construction conjunction with the <br /> The College Park developers shall not develop any developer <br /> new residential uses within 1,000 feet of the two <br /> existing on-site dairies until such time as the diaries <br /> cease operation and the dairy waste ponds and animal <br /> o refuse piles are removed. <br /> CD <br /> 4.12-5 Air Quality--Increased Long-Term Regional Before construction SJVAPCD,in <br /> CD <br /> ,o Emissions of Criteria Pollutants begins and during conjunction with the <br /> co <br /> The College Park developers shall implement all of construction developer <br /> the mitigation measures as recommended in the <br /> o Guide for Assessing and Mitigating Air Quality <br /> Impacts(SJVAPCD 1998).Many of these measures <br /> Er are already included in the proposed project design <br /> and/or are already required b the MHMP and b <br /> = Y q Y Y <br /> m ti mitigation in the MHMP and Delta College EIRs. <br /> =3 co <br /> e (n <br /> 0 � <br /> A n <br /> 7 n <br /> 0 -0 <br /> O Qj <br /> C � <br />