My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006457
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
18353
>
2600 - Land Use Program
>
PA-0600643
>
SU0006457
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2019 8:55:10 AM
Creation date
9/5/2019 10:44:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006457
PE
2638
FACILITY_NAME
PA-0600643
STREET_NUMBER
18353
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
209450014 15
ENTERED_DATE
3/1/2007 12:00:00 AM
SITE_LOCATION
18353 W GRANT LINE RD
RECEIVED_DATE
2/26/2007 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\18353\PA-0600643\SU0006457\IMP PLN.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
K rn <br /> �. O <br /> cn' > <br /> College Park at Mountain House Specific Plan III <br /> o' <br /> Mitigation Monitoring and Reporting Program <br /> Implementation Implementation&Verification <br /> Mitigation Measure Timing/Schedule ResponsibilityAction Date <br /> Completed <br /> CL operational standards shall be established to minimize <br /> X noise generated by loading dock activities from <br /> CD <br /> adversely affecting planned and existing off-site <br /> noise-sensitive land uses.Design and operational <br /> cc measures may include: <br /> cQ < Enclose outdoor noise-generating equipment <br /> and/or set back from the property line. <br /> < Locate buildings and structures such that they <br /> shield off-site sensitive receptors from on-site <br /> noise sources,including loading dock activity. <br /> < Enclose loading dock areas <br /> w < Limit loading dock activity,including delivery <br /> truck arrivals and departures,to between 7:00 <br /> a.m.and 10:00 p.m. at those loading docks with <br /> direct line of site of noise-sensitive receptors <br /> within a distance of 1,000 feet.Activity at all <br /> other loading docks shall be limited to the hours <br /> cc between 5:00 a.m. and 10:00 p.m. <br /> CD <br /> Noise studies, including on-site sound level <br /> a' measurements,shall be conducted to ensure that these <br /> m thresholds are not exceeded.The noise studies shall <br /> o be funded by the College Park developers and <br /> approved by SJCCDD before construction. <br /> w Landscape Maintenance <br /> The following measures shall apply to noise- <br /> C 0 generating activities associated with landscaping and <br /> CD maintenance of school grounds,neighborhood parks, <br /> o` 0 community parks,and open space. <br /> a < On-site landscape maintenance equipment shall <br /> 5 6 be equipped with properly operating exhaust . <br /> amufflers and engine shrouds,in accordance with . <br /> v <br /> �_ manufacturers' specifications.For maintenance <br /> = areas located within 320 feet of noise-sensitive <br />
The URL can be used to link to this page
Your browser does not support the video tag.