Laserfiche WebLink
cn c7 <br /> m o <br /> mCollege Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> mImplementation&Verification <br /> K Mitigation Measure TiminglSchedule ImplementationFDate A leted <br /> 4.13. NOISE <br /> 0 4.13-1 Noise-Generation of Temporary Construction During construction SJCCDD, in <br /> Noise conjunction with the <br /> CD <br /> Cn < Limit project construction activities to the hours developer <br /> rnbetween 6:00 a.m.and 9:00 p.m. <br /> < Comply with the San Joaquin County <br /> -n Development Title for all construction activities. <br /> < Equip all construction vehicles or equipment, <br /> fixed or mobile, with properly operating and <br /> maintained mufflers and acoustical shields or <br /> shrouds,in accordance with manufacturers' <br /> w recommendations. <br /> < Arrange all construction equipment and truck <br /> routes to minimize travel adjacent to occupied <br /> residences. <br /> < Locate stationary construction equipment and <br /> staging areas as far as possible from sensitive <br /> receptors.Temporary acoustic barriers may be <br /> v installed around stationary equipment,if <br /> necessary. <br /> a 4.13-2 Noise—Generation of New Stationary-Source During design phase SJCCDD,in <br /> Noise and during conjunction with the <br /> �. The project applicants shall incorporate the measures construction developer <br /> v <br /> identified below into the project design. <br /> Q Commercial,Office,and Industrial Uses <br /> Industrial and commercial land uses proposed as part <br /> of the College Park project shall be designed to <br /> ensure that outdoor equipment does not result in an <br /> v exceedance of 55 dBA L. during daytime hours <br /> o (7:00 a.rrL to 10:00 p.m.)or 50 dBA LEy during <br /> > nighttime hours(10:00 p.m.to 7:00 a.m.)at off-site <br /> noise-sensitive receptors.In addition,design and <br />