Laserfiche WebLink
KM <br /> o <br /> College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> Implem--talion -Ver <br /> o Mitigation Measure Timing/Schedule Implementation <br /> �. Responsibility Action Cate <br /> Completed <br /> o. 4.6-3 Cultural Resources—Potential to Uncover Human During construction SJCCDD,in <br /> Remains conjunction with the <br /> CD In accordance with the California Health and Safety developer,and in <br /> Code,if human remains are uncovered during conjunction with <br /> cn construction at the project site,the College Park qualified archaeologist <br /> 0 <br /> developer or construction contractor shall immediately and County Coroner, <br /> halt potentially damaging excavation and notify if needed. <br /> SJCCDD.The County shall,in turn,immediately <br /> notify the San Joaquin County coroner of the find.The <br /> coroner is required to examine all discoveries of <br /> human remains within 48 hours of receiving notice of <br /> a discovery on private or state lands(HSG Section <br /> a, <br /> 7050.5[b]).If the coroner determines that the remains <br /> are those of a Native American,he or she shall contact <br /> the Native American Heritage Commission(NAHC) <br /> by phone within 24 hours of making that <br /> o determination(HSC Section 7050[c]).Once a Most <br /> cCD Likely Descendent(MLD)has been designated by the <br /> o <br /> CD - . NAHC,the MLD,in consultation with the County, <br /> shall determine the ultimate disposition of the remains. <br /> The responsibilities of the County for acting upon <br /> notification of a discovery of Native American human <br /> o remains are outlined in detail in the PRC,Section <br /> 5097.9.Measures likely resulting from the above <br /> could include preservation in place and <br /> s capping/avoidance,or removal and continued <br /> Cn <br /> monitoring of ground-disturbing activities. <br /> � rn <br /> o co 4.7 DRAINAGE <br /> CD <br /> 4.7-2 Drainage—Result in Flooding or Exceed the Before construction MHCSD,in <br /> 5 0 Capacity of the Storm-drain System conjunction with the <br /> o lu <br /> The College Park developers shall expand WQB 1 as developer <br /> =3 required to accommodate runoff from the College <br /> s Park project,or shall provide the required on-site <br />