Laserfiche WebLink
cn 0 <br /> m o <br /> CID <br /> C_ <br /> rn College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> M Implementation&Verification <br /> o Implementation <br /> c Mitigation Measure Timing/Schedule <br /> 0 Responsibility Action Date <br /> Completed <br /> retention in-lieu of the required expansion of WQB 1, <br /> = before development of those portions of <br /> Neighborhoods B and D to be served by the DeAnza <br /> (D Boulevard and Mountain House Parkway storm-drain <br /> Cn <br /> systems. <br /> 4.8 WATER QUALITY <br /> :9 4.8-1 Water Quality—Potential Temporary NOT(s)submitted to MHCSD,in <br /> Construction-Related Water Quality Effects the Central Valley conjunction with the <br /> The College Park developers shall consult with the RWQCB before developer,and in <br /> Central Valley Regional Water Quality Control Board beginning of coordination with the <br /> (RWQCB)to acquire the appropriate regulatory applicable ground- Central Valley <br /> approvals that may be necessary to obtain Section disturbing or RWQCB <br /> V 401 water quality certification,ensure compliance dewatering activities; <br /> with the State Water Resources Control Board water quality <br /> (SWRCB)statewide National Pollutant Discharge performance <br /> Elimination System(NPDES)stormwater permit for standards established <br /> general construction activity and the Central Valley before construction <br /> RWQCB NPDES permit for construction dewatering begins <br /> m activity,and obtain any other necessary site-specific <br /> s WDRs or waivers issued pursuant to the Porter– <br /> Cologne Act.As requiredunder the NPDES <br /> stormwater permit for general construction activity, <br /> 3 the project applicant shall prepare a Stormwater <br /> co <br /> Pollution Prevention Plan(SWPPP)and any other <br /> necessary engineering plans and specifications for <br /> pollution prevention and control.The SWPPP and <br /> m other appropriate plans shall: <br /> < Identify and specify the use of erosion and <br /> sediment control Best Management Practices <br /> _0 (BMPs),means of waste disposal, <br /> c$ p implementation of approved local plans,non- <br /> > stormwater management controls,permanent <br /> postconstruction BMPs,and inspection and <br />