Laserfiche WebLink
cn 0 <br /> 0 0 <br /> 0 = <br /> CD <br /> C— <br /> m College Park at Mountain Howse Specific Plan III <br /> c Mitigation Monitoring and Reporting Program <br /> n Implementation&Verification <br /> Mitigation Measure Timing/Schedule Implements#ion Date <br /> Responsibility Action' Completed <br /> copy of the approved SWPPP on the construction <br /> x site. <br /> 0 <br /> M 4.9 PUBLIC HEALTH AND SAFETY <br /> -v 4.9-1 Public Health and Safety---Possible Exposure to Before and during San Joaquin County <br /> CD Pre-Existing Hazardous Materials During construction; Environmental Health <br /> Construction Before demolition, Department and the <br /> The College Park developers shall implement the renovation,or Central Valley <br /> following measures: modification of RWQCB,in <br /> < Project grading,excavation, and other earth- structures conjunction with the <br /> moving activities at the project site and off-site developer and a <br /> infrastructure locations shall be monitored at the qualified hazardous <br /> County's discretion by qualified hazardous materials expert <br /> materials experts(either qualified County staff or <br /> consultants)for signs of potential pesticide, <br /> hydrocarbon,or other contamination.If the <br /> County or consultants observe soil discoloration, <br /> noxious odors,or other signs of potential <br /> r.« contamination,Phase II testing(excavation, <br /> `Qns laboratory testing of soil,possibly groundwater <br /> testing)shall be undertaken,and any <br /> recommendations made by the consultants shall <br /> R be implemented. <br /> �. < The San Joaquin County Environmental Health <br /> co Department shall have regulatory authority over <br /> CL <br /> the investigation and clean-up of contamination <br /> A from underground storage tank releases and would <br /> D provide"no further action required" <br /> 0 determinations for that source of contamination. <br /> All aboveground storage tanks(ASTs)and <br /> underground storage tanks(USTs)at the project <br /> 23 c p site shall be removed under the supervision of a <br /> qualified hazardous material expert in accordance <br /> with applicable regulations and removal permit <br />