Laserfiche WebLink
Km <br /> a <br /> College Park at Mountain House Specific Plan III <br /> _ Mitigation Monitoring and Reporting Programs <br /> M. Implementation Emplemen#ation&Verifcafion <br /> Mitigation Measure Timing/Schedule Responsibility Action Date <br /> Completed <br /> cn <br /> maintenance responsibilities; <br /> < Specify the pollutants that are likely to be used <br /> oduring construction that could be present in <br /> stormwater drainage and non-stormwater <br /> cn discharges; <br /> a <br /> < Specify BMP inspection protocols to ensure that <br /> CQ the BMPs.are effective and ensure that the <br /> 3 monitoring is conducted if nonvisible pollutants <br /> are inadvertently discharged into stormwater. <br /> < Identify construction techniques that will reduce <br /> the potential for runoff; <br /> < Identify the erosion and sedimentation control <br /> CO measures to be implemented; <br /> < Specify spill prevention and contingency <br /> measures; <br /> < Identify the types of materials used for <br /> o equipment operation; <br /> �D < Identify measures to prevent or clean up spills of _ <br /> CD hazardous materials used for equipment <br /> operation and hazardous waste; <br /> CO < Identify emergency procedures for responding to <br /> spills; <br /> a < Identify BMPs that shall be used in all <br /> subsequent site-development activities; <br /> z <br /> < Identify personnel training requirements and <br /> C/) procedures that will be used to ensure that <br /> ro workers are aware of permit requirements and <br /> C Cn proper installation and performance inspection <br /> CD methods for specified BMPs; <br /> 0 < Identify the appropriate personnel responsible for <br /> o U supervisory duties related to implementation of <br /> jl! �_ the SWPPP;and <br /> i `Z < Require all construction contractors to retain a <br />;i <br />