Laserfiche WebLink
cn r� <br /> au o <br /> CD <br /> College Park at Mountain House Specific Plan III <br /> v Mitigation Monitoring and Reporting Program <br /> Implementation Implementation &Verification <br /> o Mitigation Measure TiminglSchedule Responsibility Action Date <br /> -Z _ Completed <br /> employing one of several methods outlined in <br /> z Section 5.2.4.15 of the SJMSCP.These include <br /> Cretention of tall vegetation,regular discing of the <br /> CD site,or use of chemicals or traps to kill ground <br /> msquirrels; <br /> CD ► Pre-construction surveys for burrowing owls <br /> shall be conducted where project construction <br /> activities would occur within 75 meters of <br /> ' suitable habitat(based on SJCOG review).The <br /> survey shall be conducted within 2 weeks of the <br /> beginning of construction. If burrowing owls are <br /> found,the following measures shall be <br /> implemented: <br /> • During the nonbreeding season(September 1 <br /> through January 31),burrowing owls <br /> occupying the project site shall be evicted <br /> from the project site by passive relocation,as <br /> described in the DFG's Staff Report on <br /> Burrowing Owls(DFG 1995). <br /> o0During the breeding season(February 1 <br /> = through August 31),occupied burrows shall <br /> 0 not be disturbed and shall be provided with a <br /> 0 250-foot protective buffer until and unless <br /> the Technical Advisory Committee,with the <br /> m concurrence of the permitting agencies' <br /> CL representatives on the Technical Advisory <br /> rn Committee,or a qualified biologist approved <br /> by the permitting agencies,verifies through <br /> noninvasive means that either(1)the birds <br /> `Q have not begun egg laying or(2)juveniles <br /> c3 rn from the occupied burrows are foraging <br /> independently and are capable of <br /> independent survival.After the fledglings <br />