Laserfiche WebLink
K m <br /> ;-.: O <br /> a <br /> ZE College Park at Mountain House Specific Plan U1 <br /> Mitigation Monitoring and Reporting Program <br /> Implementation-&Verification.. - <br /> �. <br /> o Mitigation Measure Timing/Schedule Implementation Date Responsibility Action <br /> Completed <br /> CL are capable of independent survival,the <br /> burrow canbe destroyed. <br /> m <br /> 4.10-6 Biological Resources—Conversion of Common Before and during SJCOG,in <br /> Nesting Raptor Habitat and Possible Loss of construction consultation with DFG <br /> co <br /> Active Nests <br /> CO < The College Park developers shall request <br /> coverage under the SJMSCP,and fees shall be <br /> paid in the amount determined by SJCOG during <br /> the application and review process for each <br /> project under College Park.Potential nest sites <br /> for all tree-nesting species are scattered <br /> throughout much of the College Park site,but are <br /> CO concentrated along Grant Line Road and at Grant <br /> Line Village. Suitable nesting habitat for <br /> northern harrier is provided by all field crops and <br /> n fallow fields.During the SJMSCP application <br /> process,SJCOG will determine whether that <br /> CD <br /> specific project site supports suitable nesting <br /> habitat.If SJCOG determines suitable habitat is <br /> present on or adjacent to a given project site,the <br /> o; SJMSCP incidental take avoidance and <br /> o minimization measures described below for <br /> nesting raptors shall be implemented.Additional <br /> measures below shall be implemented to avoid <br /> = loss of active nests of common raptor species, <br /> C N which are not covered under the SJMSCP but are <br /> protected under the California Fish and Game <br /> as � Code.The project applicants shall retain <br /> qualified biologists to conduct all pre- <br /> construction surveys. <br /> c �_0—, < White-tailed Kite.If project construction begins <br /> during the nesting season(February 15- <br /> September 15),pre-construction surveys shall be <br />