Laserfiche WebLink
Km <br /> � a <br /> n <br /> o College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> Implementation Implementation&Verification <br /> Mitigation Measure Timing/Schedule Responsibility Action Date <br /> co Completed <br /> Q. during the nesting season(February 15–August <br /> x 31),pre-construction surveys shall be conducted <br /> `D during the nesting season in suitable nesting <br /> habitat within 500 feet of areas of project <br /> cfl activity.The survey shall be conducted within <br /> a <br /> the 2 weeks before construction or tree removal <br /> begins.If any active nests are found,a setback of <br /> 200 feet from each nest shall be established and <br /> maintained during the nesting season for the <br /> period encompassing nest building and <br /> continuing until fledglings leave nests. This <br /> setback applies whenever construction or other <br /> ground-disturbing activities must begin during <br /> the nesting season in the presence of nests that <br /> are known to be occupied. Setbacks shall be <br /> marked by brightly colored temporary fencing. <br /> 0 4.10-7 Biological Resources—Conversion of Other Before construction SJCOG,in <br /> ca Special-Status Nesting Bird Habitat and Possible (surveys shall be consultation with DFG <br /> `D Loss of Active Nests conducted 2 weeks <br /> WThe College Park developers shall request coverage prior to construction <br /> a, under the SJMSCP,and fees shall be paid in the activities) <br /> amount determined by SJCOG during the application <br /> and review process for each project under College <br /> Park.During the SJMSCP application process, <br /> SJCOG will determine whether that specific project <br /> Cl) <br /> site supports suitable habitat for loggerhead shrike, <br /> 0 California horned lark,or tricolored blackbird.If <br /> rn SJCOG determines suitable habitat is present on or <br /> W m adjacent to a given project site,the following <br /> 0 SJMSCP incidental take avoidance and minimization <br /> o -0 measures shall be implemented by the project <br /> applicants in consultation with a qualified biologist. <br /> < Loggerhead Shrike.if project construction <br />